Conception, development, installation and evaluation of a real time evacuation assistant for complex buildings

被引:5
|
作者
Wagoum, Armel Ulrich Kemloh [1 ]
Seyfried, Armin [1 ]
机构
[1] Forschungszentrum Julich, Julich Supercomp Ctr, D-52428 Julich, Germany
来源
2ND CONFERENCE OF TRANSPORTATION RESEARCH GROUP OF INDIA (2ND CTRG) | 2013年 / 104卷
关键词
Evacuation system; route choice; pedestrian traffic; congestions; forecast;
D O I
10.1016/j.sbspro.2013.11.167
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
In this contribution a pedestrian evacuation system for large buildings is presented. The aim of the system is to monitor and forecast pedestrian streams in complex facilities to assist decision makers and security services in case of emergency. Since the last decades the study of pedestrian dynamics has gained more attention due to continuously growing urban population and cities. This growth is accompanied by an increase not only in size but also in frequencies of large-scale events. The increase sets new challenges to architects, urban planners and organizers of such events. The growing interest in large-scale events additionally requires increased security measures and new security concepts that are tailored to the large amount of people. The hereby designed system is capable of performing real time forecasts of pedestrian traffic for the next 15 minutes starting from the current situation. The test venue for the system is a multi-functional arena in Dusseldorf, North Rhine-Westphalia, Germany. The emphasis in this contribution is set not only on the development and the deployment of the system but also on the validation of the results during the operational phase. (C) 2013 The Authors. Published by Elsevier Ltd.
引用
收藏
页码:728 / 736
页数:9
相关论文
共 50 条
  • [1] Real-time evacuation route selection methodology for complex buildings
    Cuesta, Arturo
    Abreu, Orlando
    Balboa, Adriana
    Alvear, Daniel
    FIRE SAFETY JOURNAL, 2017, 91 : 947 - 954
  • [2] Testing a real-time intelligent evacuation guiding system for complex buildings
    Balboa, Adriana
    Gonzalez-Villa, Javier
    Cuesta, Arturo
    Abreu, Orlando
    Alvear, Daniel
    SAFETY SCIENCE, 2020, 132 (132)
  • [3] Runtime Optimisation Approaches for a Real-Time Evacuation Assistant
    Wagoum, Armel Ulrich Kemloh
    Steffen, Bernhard
    Seyfried, Armin
    PARALLEL PROCESSING AND APPLIED MATHEMATICS, PT I, 2012, 7203 : 386 - 395
  • [4] Automated Evaluation of the Evacuation Performance for Large Complex Buildings Based on BIM
    Gao, Guoping
    Guan, Changsheng
    ICCREM 2017: PROJECT MANAGEMENT AND CONSTRUCTION TECHNOLOGY, 2017, : 190 - 198
  • [5] A Distributed Architecture for Real-Time Evacuation Guidance in Large Smart Buildings
    Lujak, Marin
    Billhardt, Holger
    Dunkel, Juergen
    Fernandez, Alberto
    Hermoso, Ramon
    Ossowski, Sascha
    COMPUTER SCIENCE AND INFORMATION SYSTEMS, 2017, 14 (01) : 257 - 282
  • [6] Evacuation Time Estimation Model in Large Buildings Based on Individual Characteristics and Real-Time Congestion Situation of Evacuation Exit
    Deng, Qing
    Zhang, Bo
    Zhou, Zheng
    Deng, Hongyu
    Zhou, Liang
    Zhou, Zhengqing
    Jiang, Huiling
    FIRE-SWITZERLAND, 2022, 5 (06):
  • [7] Time Estimation and Hotspot Detection in the Evacuation of a Complex of Buildings: A Mesoscopic Approach and Case Study
    Zambrano, Jony A.
    Huertas, Jorge A.
    Segura-Duran, Ethel
    Medaglia, Andres L.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2020, 67 (03) : 641 - 658
  • [8] CONCEPTION METHODOLOGY FOR COMPLEX CONTROL-SYSTEMS IN REAL-TIME
    CALVEZ, JP
    THOMAS, Y
    RAIRO-AUTOMATIQUE-SYSTEMS ANALYSIS AND CONTROL, 1984, 18 (02): : 251 - 266
  • [9] Development of a new evacuation simulation tool targeting real-time participation
    Montecchiari, G.
    Bulian, G.
    Gallina, P.
    RISK, RELIABILITY AND SAFETY: INNOVATING THEORY AND PRACTICE, 2017, : 571 - 578
  • [10] Development of BIM-based evacuation regulation checking system for high-rise and complex buildings
    Choi, Jungsik
    Choi, Junho
    Kim, Inhan
    AUTOMATION IN CONSTRUCTION, 2014, 46 : 38 - 49