An optimal solution for the stochastic version of the Wagner-Whitin dynamic lot-size model

被引:35
作者
Vargas, Vicente [1 ]
机构
[1] Univ San Diego, Sch Business Adm, San Diego, CA 92110 USA
关键词
Production; Inventory; Optimal policies; Finite horizon; Dynamic programming; SERVICE-LEVEL CONSTRAINTS; SIZING PROBLEM; DEMAND;
D O I
10.1016/j.ejor.2008.09.003
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We present an algorithm for determining the optimal solution over the entire planning horizon for the dynamic lot-size model where demand is stochastic and non-stationary. The optional Solution to the deterministic problem is the well-known Wagner-Whitin algorithm. The present work contributes principally to knowledge building and provides a tool for researchers. One potentially useful contribution to practice is the solution to an important special case, where demand follows normal distributions. Other contributions to practice will likely flow front the development of improved heuristics and the improved basis to evaluate heuristic performance. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:447 / 451
页数:5
相关论文
共 23 条
[1]   A PROCEDURE FOR PRODUCTION LOT SIZING WITH PROBABILISTIC DYNAMIC DEMAND [J].
ASKIN, RG .
AIIE TRANSACTIONS, 1981, 13 (02) :132-137
[2]  
Benton W., 1982, J Oper Manag, V2, P137, DOI DOI 10.1016/0272-6963(82)90029-8
[3]   STRATEGIES FOR THE PROBABILISTIC LOT-SIZING PROBLEM WITH SERVICE-LEVEL CONSTRAINTS [J].
BOOKBINDER, JH ;
TAN, JY .
MANAGEMENT SCIENCE, 1988, 34 (09) :1096-1108
[4]  
Callarman T. E., 1984, International Journal of Operations & Production Management, V4, P39, DOI 10.1108/eb054713
[5]  
De Bodt M. A., 1983, Decision Sciences, V14, P345, DOI 10.1111/j.1540-5915.1983.tb00190.x
[6]  
Hopp W. J., 2004, Management Science, V50, DOI 10.1287/mnsc.1040.0299
[7]   THE STOCHASTIC DISCRETE DYNAMIC LOT SIZE PROBLEM - AN OPEN-LOOP SOLUTION [J].
LASSERRE, JB ;
BES, C ;
ROUBELLAT, F .
OPERATIONS RESEARCH, 1985, 33 (03) :684-689
[8]  
New C, 1975, Prod Invent Manag, V16, P1
[9]  
Orlicky J., 1975, Material requirements planning: the new way of life in production and inventory management
[10]   INVENTORY CONTROL UNDER A PROBABILISTIC TIME-VARYING, DEMAND PATTERN [J].
SILVER, E .
AIIE TRANSACTIONS, 1978, 10 (04) :371-379