Integrating risk into estimations of project activities' time and cost: A stratified approach

被引:26
作者
Asadabadi, Mehdi Rajabi [1 ]
Zwikael, Ofer [1 ]
机构
[1] Australian Natl Univ, Coll Business & Econ, Res Sch Management, 26 Kingsley St, Canberra, ACT 2601, Australia
关键词
Stratified multi-criteria decision making (SMCDM); Project management; Concept of stratification (CST); Risk and uncertainty; MANAGEMENT; UNCERTAINTY; DURATION;
D O I
10.1016/j.ejor.2019.11.018
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Time and cost estimations of project activities are challenging tasks for project managers and planners. As a result of the high level of risk and uncertainty present during the early stages of projects, the reliability of these estimations during project planning remains poor. This study argues that this reliability can be improved through using the 'concept of stratification'. This concept considers a set of states and describes a system that receives inputs (associated with outputs), based on which the system transitions from one state to another. This provides a unique structure that is capable of considering uncertainty related to events that may occur during a project. This paper explains how the concept of stratification can be used to compute estimations of the time and cost of activities involved in a project. The method is illustrated with a construction project that has uncertain events. By determining specific activities' estimated time and cost, the project's estimated time and cost can also be calculated. Thus, the proposed method increases the reliability of estimations of projects' completion time and cost. (c) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:482 / 490
页数:9
相关论文
共 36 条