Simultaneous determination of multiproduct batch and full truckload shipment schedules

被引:14
作者
Banerjee, Avijit [1 ]
机构
[1] Drexel Univ, Dept Decis Sci, Philadelphia, PA 19063 USA
关键词
Economic lot scheduling; Full truckload shipments; Supply chain coordination; Inventory model; SINGLE MACHINE SYSTEM; LOT SIZES; PRODUCTS; FEASIBILITY; PERIOD;
D O I
10.1016/j.ijpe.2008.08.015
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A fundamental premise of the well-known economic lot-scheduling problem (ELSP) is that the finished products are consumed at continuous rates, i.e. their respective cycle's supply chains, inventories are depleted on the basis of unit transactions. In today however, employing complex distribution networks, finished goods inventories from manufacturing plants are usually shipped in bulk to succeeding stages along the distribution process. Moreover, existing transport economies often tend to favor full truckload (TL), rather that partial or less than truckload (LTL) shipments, for economical movement of such goods. The scenario examined here, however, involves a set of products, for which individual TL shipments are uneconomical. As a remedy, we construct a model for taking advantage of TL rates by combining LTL quantities of the items into a full load. We adopt the common cycle approach for the ELSP, in conjunction with a common replenishment cycle, as a coordination mechanism that is simple to analyze and implement. This is integrated with a periodic full truckload shipping schedule. Such effective coordination of production and shipment schedules is likely to result in a more streamlined supply chain. The concepts developed are illustrated through a simple numerical example. (C) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:111 / 117
页数:7
相关论文
共 25 条
[1]   THE 2-PRODUCT, SINGLE-MACHINE, STATIC DEMAND, INFINITE HORIZON LOT SCHEDULING PROBLEM [J].
BOCTOR, FF .
MANAGEMENT SCIENCE, 1982, 28 (07) :798-807
[2]  
Bomberger EarlE., 1966, Management Science, V12, P778, DOI [https://doi.org/10.1287/mnsc.12.11.778, DOI 10.1287/MNSC.12.11.778]
[3]  
Chopra S., 2004, SUPPLY CHAIN MANAGEM
[4]   SCHEDULING ECONOMIC LOT SIZE PRODUCTION-RUNS [J].
DAVIS, SG .
MANAGEMENT SCIENCE, 1990, 36 (08) :985-998
[5]   LOT SIZING AND SEQUENCING FOR N-PRODUCTS ON ONE FACILITY [J].
DELPORTE, CM ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1977, 23 (10) :1070-1079
[6]   ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM [J].
DOLL, CL ;
WHYBARK, DC .
MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01) :50-55
[7]   ECONOMIC LOT SCHEDULING PROBLEM (ELSP) - REVIEW AND EXTENSIONS [J].
ELMAGHRABY, SE .
MANAGEMENT SCIENCE, 1978, 24 (06) :587-598
[8]  
GENG PC, 1988, NAV RES LOG, V35, P605, DOI 10.1002/1520-6750(198808)35:4<605::AID-NAV3220350412>3.0.CO
[9]  
2-V
[10]   INTEGRATED INVENTORY MODELS - THE BUYER VENDOR COORDINATION [J].
GOYAL, SK ;
GUPTA, YP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 41 (03) :261-269