Beam dynamics measurements using a gated beam-position monitor at KEKB

被引:8
作者
Ieiri, T. [1 ]
Akai, K. [1 ]
Fukuma, H. [1 ]
Tobiyama, M. [1 ]
机构
[1] KEK, Tsukuba, Ibaraki 3050801, Japan
关键词
Bunch-by-bunch measurement; Beam phase; Beam loading;
D O I
10.1016/j.nima.2009.04.036
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
Effective head-on collision in finite-angle crossing beam orbit was established by installing crab cavities in KEKB, an asymmetric electron/positron collider. During the crabbing collision, bunch-by-bunch measurements for determining the transverse positions of the beam and the beam phase were carried out using a gated beam-position monitor (GBPM). The measurements made using the GBPM revealed new beam behavior. Using the monitor, displacements in the horizontal beam position and variations in the beam phase along a bunch train could be determined. The horizontal displacement was found to be caused by a phase-shifted bunch passing through the crab cavity. The monitor also detected a rapid change in the beam phase at the leading part of a bunch train. Parasitic modes with low Q values in the normal conducting (NC) cavities are one candidate considered responsible for causing the rapid changes in the beam phase. Moreover, a fast gate module, which helps in selecting a bunch with a 2-ns spacing has been developed for use in future studies. (C) 2009 Elsevier B.V. All rights reserved.
引用
收藏
页码:248 / 256
页数:9
相关论文
共 22 条
  • [1] Commissioning of KEKB
    Akai, K
    Akasaka, N
    Enomoto, A
    Flanagan, J
    Fukuma, H
    Funakoshi, Y
    Furukawa, K
    Furuya, T
    Haba, J
    Hiramatsu, S
    Hosoyama, K
    Ieiri, T
    Iida, N
    Ikeda, H
    Kamada, S
    Kamitani, T
    Kato, S
    Kikuchi, M
    Kikutani, E
    Koiso, H
    Kurokawa, S
    Masuzawa, M
    Matsumoto, T
    Mimashi, T
    Mitsuhashi, T
    Nakamura, TT
    Ogawa, Y
    Ohmi, K
    Ohnishi, Y
    Ohsawa, S
    Ohuchi, N
    Oide, K
    Perevedentsev, E
    Satoh, K
    Suetake, M
    Suetsugu, Y
    Suwada, T
    Tawada, M
    Tejima, M
    Tobiyama, M
    Uno, S
    Wu, Y
    Yamamoto, N
    Yoshida, M
    Yoshioka, M
    Yoshimoto, S
    Zimmermann, F
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2003, 499 (01) : 191 - 227
  • [2] Akai K., 1998, P 6 EUR PART ACC C S, P1749
  • [3] Boussard D., 1991, Conf. Proc. C., P2447
  • [4] CHAO AW, 1998, HDB ACCELERATOR PHYS, P110
  • [5] FLANAGAN JW, 2004, LETT INTENT KEK SUPE
  • [6] FUKUMA H, 2004, P ECLOUD04 NAP CA US
  • [7] Hosoyama K, 2008, P EPAC08, P2927
  • [8] Bunch-by-bunch measurements of the betatron tune and the synchronous phase and their applications to beam dynamics at KEKB
    Ieiri, T
    Akai, K
    Fukuma, H
    Kawamoto, T
    Kikutani, E
    Tobiyama, M
    [J]. PHYSICAL REVIEW SPECIAL TOPICS-ACCELERATORS AND BEAMS, 2002, 5 (09): : 55 - 67
  • [9] A four-dimensional beam-position monitor
    Ieiri, T
    Kawamoto, T
    [J]. NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2000, 440 (02) : 330 - 337
  • [10] IEIRI T, 2004, P EPAC 04 LUC SWITZ, P2095