Fuzzy Group Decision Making: A Case Using FTOPSIS in Mega Project Risk Identification and Analysis Concurrently

被引:6
作者
Mojtahedi, S. M. H. [1 ]
Mousavi, S. M. [1 ]
Aminian, A. [2 ]
机构
[1] Islamic Azad Univ, S Tehran Branch, Grad Sch, Dept Ind Engn, Tehran, Iran
[2] Univ IAU, Dept Ind Engn, Tehran, Iran
来源
IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3 | 2008年
关键词
Mega project; fuzzy MAGDM; risk analysis; risk identification;
D O I
10.1109/IEEM.2008.4738176
中图分类号
F [经济];
学科分类号
02 ;
摘要
This study aims at improving the quality and effectiveness of decision making in project risk management. Conventional approaches to risk identification and risk assessment separately tend to be less effective in dealing with the imprecise of the risk assessment individually. In order to solve this problem, project manager need to evaluate their problem including both quantitative and qualitative criteria and to make accurate decisions. For this reason, a systematic decision process for identifying and analyzing risks concurrently by applying Multi Attribute Group Decision Making (MAGDM) in fuzzy environment is proposed. The paper introduces a new procedure for classifying potential risks. Obtained results have been applied in one mega project successfully.
引用
收藏
页码:1769 / +
页数:2
相关论文
共 14 条
  • [1] Chapman C.B., 2004, PROJECT RISK MANAGEM
  • [2] CHAPMAN R, 1999, INT J PROJ MANAG, V19, P147
  • [3] Evaluating attack helicopters by AHP based on linguistic variable weight
    Cheng, CH
    Yang, KL
    Hwang, CL
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 116 (02) : 423 - 435
  • [4] COOPER D., 2005, PROJECT RISK MANAGEM
  • [5] Hillson D., 2002, INT J PROJ MANAG, V20, P235, DOI DOI 10.1016/S0263-7863(01)00074-6
  • [6] HILLSON D, 2002, P 3 C PROJ MAN I ANN
  • [7] Lin M.J., 1987, Group Decision Making under Multiple Criteria: Methods and Applications
  • [8] MAKOUI A, 2007, P 1 INT RISK C TEHR, P107
  • [9] MILANI AS, 2007, P 18 IASTED C MONTR, P550
  • [10] Moosavi S.M., 2007, P 1 INT RISK C, P169