Batching and resource allocation decisions on an m-machine proportionate flowshop

被引:3
|
作者
Oron, Daniel [1 ,2 ]
机构
[1] Univ Sydney, Sch Business, Sydney, NSW, Australia
[2] Univ Sydney, Sydney, NSW, Australia
关键词
Proportionate flowshop; batching; makespan; resource consumption function; workload; TOTAL COMPLETION-TIME; SCHEDULING PROBLEM; SHOP;
D O I
10.1080/01605682.2018.1495996
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This article considers an m-machine proportionate flowshop scheduling problem where each stage of production consists of a batching operation. Moreover, we assume that the job processing times are controllable through the allocation of a non-renewable resource. The objective consists of minimising the makespan. The scheduler's task consists of (1) allocating jobs to batches; (2) scheduling batches on the m-machine flowshop; (3) allocating resources to batches; and (4) allocating the resources within each batch to jobs. We show that there exists an optimal solution to the problem that consists of sequencing the jobs in ?-shape order based on their workloads. Furthermore, the jobs that are sorted in non-decreasing order of workload are scheduled in batches of equal size, whereas the remaining jobs are allocated to batches of different sizes. We present an time algorithm based on the observation that all jobs scheduled in the first segment of the ?-shape have workloads that are smaller than (or equal to) that of the last job in the sequence.
引用
收藏
页码:1571 / 1578
页数:8
相关论文
共 50 条
  • [21] New heuristics for m-machine no-wait flowshop to minimize total completion time
    Aldowaisan, T
    Allahverdi, A
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2004, 32 (05): : 345 - 352
  • [22] Multi-objective lot splitting for a single product m-machine flowshop line
    Bukchin, J
    Masin, M
    IIE TRANSACTIONS, 2004, 36 (02) : 191 - 202
  • [23] A grasp algorithm for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness
    Khan, B. Shahul Hamid
    Prabhaharan, G.
    Asokan, P.
    INTERNATIONAL JOURNAL OF COMPUTER MATHEMATICS, 2007, 84 (12) : 1731 - 1741
  • [24] The m-machine flowshop problem with unit-time operations and intree precedence constraints
    Averbakh, I
    Berman, O
    Chernykh, I
    OPERATIONS RESEARCH LETTERS, 2005, 33 (03) : 263 - 266
  • [25] The M-machine multicomputer
    Marco Fillo
    Stephen W. Keckler
    William J. Dally
    Nicholas P. Carter
    Andrew Chang
    Yevgeny Gurevich
    Whay S. Lee
    International Journal of Parallel Programming, 1997, 25 : 183 - 212
  • [26] Modeling and Analysis of Multiobjective Lot Splitting for N-Product M-Machine Flowshop Lines
    Bukchin, Yossi
    Masin, Michael
    Kirshner, Rinat
    NAVAL RESEARCH LOGISTICS, 2010, 57 (04) : 354 - 366
  • [27] The M-Machine multicomputer
    Fillo, M
    Keckler, SW
    Dally, WJ
    Carter, NP
    Chang, A
    Gurevich, Y
    Lee, WS
    INTERNATIONAL JOURNAL OF PARALLEL PROGRAMMING, 1997, 25 (03) : 183 - 212
  • [28] Flowshop scheduling problem with a batching machine and task compatibilities
    Oulamara, A.
    Finke, G.
    Kuiteing, A. Kamgaing
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) : 391 - 401
  • [29] A branch and bound algorithm to minimize the total flow time for m-machine permutation flowshop problems
    Chung, CS
    Flynn, J
    Kirca, O
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2002, 79 (03) : 185 - 196
  • [30] Note on "Single-machine and flowshop scheduling with a general learning effect model" and "Some single-machine and m-machine flowshop scheduling problems with learning considerations"
    Kuo, Wen-Hung
    Yang, Dar-Li
    INFORMATION SCIENCES, 2010, 180 (19) : 3814 - 3816