Batching and resource allocation decisions on an m-machine proportionate flowshop

被引:3
|
作者
Oron, Daniel [1 ,2 ]
机构
[1] Univ Sydney, Sch Business, Sydney, NSW, Australia
[2] Univ Sydney, Sydney, NSW, Australia
关键词
Proportionate flowshop; batching; makespan; resource consumption function; workload; TOTAL COMPLETION-TIME; SCHEDULING PROBLEM; SHOP;
D O I
10.1080/01605682.2018.1495996
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This article considers an m-machine proportionate flowshop scheduling problem where each stage of production consists of a batching operation. Moreover, we assume that the job processing times are controllable through the allocation of a non-renewable resource. The objective consists of minimising the makespan. The scheduler's task consists of (1) allocating jobs to batches; (2) scheduling batches on the m-machine flowshop; (3) allocating resources to batches; and (4) allocating the resources within each batch to jobs. We show that there exists an optimal solution to the problem that consists of sequencing the jobs in ?-shape order based on their workloads. Furthermore, the jobs that are sorted in non-decreasing order of workload are scheduled in batches of equal size, whereas the remaining jobs are allocated to batches of different sizes. We present an time algorithm based on the observation that all jobs scheduled in the first segment of the ?-shape have workloads that are smaller than (or equal to) that of the last job in the sequence.
引用
收藏
页码:1571 / 1578
页数:8
相关论文
共 50 条
  • [1] Optimal scheduling for an automated m-machine flowshop
    Cheng, JL
    Kise, H
    Karuno, Y
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1997, 40 (03) : 356 - 372
  • [2] A NEW HEURISTIC FOR THE N-JOB, M-MACHINE FLOWSHOP PROBLEM
    HO, JC
    CHANG, YL
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 52 (02) : 194 - 202
  • [3] Minimizing makespan on an m-machine re-entrant flowshop
    Choi, Seong-Woo
    Kim, Yeong-Dae
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (05) : 1684 - 1696
  • [4] A Bi-Criteria Approach to the M-machine Flowshop Scheduling Problem
    Rajkumar, R.
    Shahabudeen, P.
    Nagaraj, P.
    Arunachalam, S.
    Page, T.
    STUDIES IN INFORMATICS AND CONTROL, 2009, 18 (02): : 127 - 136
  • [5] Some single-machine and m-machine flowshop scheduling problems with learning considerations
    Lee, Wen-Chiung
    Wu, Chin-Chia
    INFORMATION SCIENCES, 2009, 179 (22) : 3885 - 3892
  • [6] A Genetic Algorithm to Minimize the Total Tardiness for M-Machine Permutation Flowshop Problems
    Chung, Chia-Shin
    Flynn, James
    Rom, Walter
    Stalinski, Piotr
    JOURNAL OF ENTREPRENEURSHIP MANAGEMENT AND INNOVATION, 2012, 8 (02) : 26 - 43
  • [7] Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations
    Yu-Hsiang Chung
    Lee-Ing Tong
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 355 - 367
  • [8] Branch-and-bound algorithms for scheduling in an m-machine no-wait flowshop
    Narayanaprasad Madhushini
    Chandrasekharan Rajendran
    Sādhanā, 2020, 45
  • [9] Makespan minimization for m-machine permutation flowshop scheduling problem with learning considerations
    Chung, Yu-Hsiang
    Tong, Lee-Ing
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (1-4): : 355 - 367
  • [10] A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
    Eren, Tamer
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 284 - 293