Commissioning and operation of the deuteron injector for PKUNIFTY project

被引:4
作者
Ren, H. T. [1 ]
Peng, S. X. [1 ]
Lu, P. N. [1 ]
Zhao, J. [1 ]
Zhou, Q. F. [1 ]
Song, Z. Z. [1 ]
Yuan, Z. X. [1 ]
Yu, J. X. [1 ]
Guo, Z. Y. [1 ]
Chen, J. E. [1 ]
机构
[1] Peking Univ, Inst Heavy Ion Phys, State Key Lab Nucl Phys & Technol, Beijing 100871, Peoples R China
关键词
D O I
10.1063/1.4826337
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
PKUNIFTY (PeKing University Neutron Imaging FaciliTY), a thermal neutron imaging facility based on a 2 MeV RFQ accelerator, has been constructed at Peking University. Its deuteron injector, which consists of a 2.45 GHz permanent magnet electron cyclotron resonance (PMECR) deuteron ion source and a two-solenoid low energy beam transport (LEBT), aims at producing and delivering 50 mA, 50 keV deuteron beam with a duty factor of 10% (1 ms, 100 Hz). In the preliminary tests of RFQ accelerator, the ECR ion source and LEBT are required to operate at various duty factors (from 1% to 10%). The deuteron ion source has been tested with different pulse widths for this reason. In order to optimize the transmission parameters, the beam current at the exit of RFQ as a function of solenoids tuning and steering magnets tuning are carefully studied. The beam emittance at the entrance of RFQ has been measured with space charge compensation by different argon gas (RG) pressure from 1.6 x 10(-4) Pa to 4.7 x 10(-3) Pa. The measuring results show the best compensating pressure is 3.5 x 10(-3) Pa with a minimal normalized rms emittance of 0.12 pi mm mrad. During the commissioning, we found the purity of deuteron gas is an important factor which severely affects ECR discharge and plasma intensity inside the ion source chamber. The detailed experimental results obtained during the commissioning are discussed in this paper. (C) 2013 AIP Publishing LLC.
引用
收藏
页数:3
相关论文
共 7 条
  • [1] Emittance improvement of the electron cyclotron resonance high intensity light ion source proton beam by gas injection in the low energy beam transport
    Beauvais, PY
    Ferdinand, R
    Gobin, R
    Lagniel, JM
    Leroy, PA
    Celona, L
    Ciavola, G
    Gammino, S
    Pottin, B
    Sherman, J
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2000, 71 (03) : 1413 - 1416
  • [2] Guo ZY., 2012, PHYS PROCEDIA, V26, P70, DOI 10.1016/j.phpro.2012.03.011
  • [3] ISMAIL AB, 2007, PHYS REV SPEC TOP-AC, V10, P101
  • [4] Lu Y R, 2013, P IPAC2013 SHANGH CH, P163
  • [5] Deuteron injector for Peking University Neutron Imaging Facility project
    Ren, H. T.
    Peng, S. X.
    Lu, P. N.
    Zhou, Q. F.
    Yuan, Z. X.
    Zhao, J.
    Zhang, M.
    Song, Z. Z.
    Yu, J. X.
    Guo, Z. Y.
    Chen, J. E.
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2012, 83 (02)
  • [6] The deuteron injector progress of the Peking University Neutron Imaging Facility project
    Ren, H. T.
    Peng, S. X.
    Zhang, M.
    Zhou, Q. F.
    Song, Z. Z.
    Yuan, Z. X.
    Lu, P. N.
    Xu, R.
    Zhao, J.
    Yu, J. X.
    Lu, Y. R.
    Guo, Z. Y.
    Chen, J. E.
    [J]. REVIEW OF SCIENTIFIC INSTRUMENTS, 2010, 81 (02)
  • [7] Uriot D., 2013, P IPAC2013 SHANGH CH, P3764