Ga-based resource leveling optimization for construction project

被引:0
|
作者
Zhao, Sheng-Li [1 ]
Liu, Yan [1 ]
Zhao, Hong-Mei [2 ]
Zhou, Ri-Lin [1 ]
机构
[1] Hebei Agr Univ, Rural & Urban Construct Coll, Baoding 071001, Peoples R China
[2] Hebei Agr Univ, Informat Sci & Technol Coll, Baoding 071001, Peoples R China
来源
PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7 | 2006年
关键词
resource leveling; genetic algorithms; optimization; construction project;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The objective of this paper is to present a GA-based optimal model for resource leveling problem, which overcomes the drawbacks of traditional resource leveling models. Based on the problem characteristics, the code scheme, genetic operators and algorithm structure of the proposed model are designed. By adopting several improved techniques, the GA-based model can determines the optimal solution to multiple resources leveling problems for a construction project. A case example is presented to demonstrate the performance of the GA-based model against heuristic methods.
引用
收藏
页码:2363 / +
页数:3
相关论文
共 50 条
  • [1] GA-Based Equipment Support Resource Leveling Optimization
    Wang, J. C.
    Wei, M.
    Shi, Y. F.
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE, EDUCATION MANAGEMENT AND SPORTS EDUCATION, 2015, 39 : 805 - 808
  • [2] A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
    Masmoudi, Malek
    Hait, Alain
    PROCEEDINGS OF THE 7TH CONFERENCE OF THE EUROPEAN SOCIETY FOR FUZZY LOGIC AND TECHNOLOGY (EUSFLAT-2011) AND LFA-2011, 2011, : 665 - 672
  • [3] GA-based multi-objective optimization of finance-based construction project scheduling
    Fathi, Habib
    Afshar, Abbas
    KSCE JOURNAL OF CIVIL ENGINEERING, 2010, 14 (05) : 627 - 638
  • [4] GA-based multi-objective optimization of finance-based construction project scheduling
    Habib Fathi
    Abbas Afshar
    KSCE Journal of Civil Engineering, 2010, 14 : 627 - 638
  • [5] RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
    EASA, SM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (02): : 302 - 316
  • [6] Ant colony optimization algorithm for resource leveling problem of construction project
    Xiong, Ying
    Kuang, Ya Ping
    PROCEEDINGS OF CRIOCM 2006 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2006, : 384 - 391
  • [7] A ship-construction dataset for resource leveling optimization in large project management problems
    Kyriklidis, Christos
    Dounias, Georgios
    DATA IN BRIEF, 2023, 49
  • [8] GA applied in project resource allocation and leveling scheduling problem
    Luo, SP
    Tang, XZ
    Lin, LF
    Progress in Intelligence Computation & Applications, 2005, : 703 - 708
  • [9] GA-based Resource Transportation Scheduling Optimization of Open-pit Mine
    He Miao
    Zhou Jinsheng
    Nie Dexin
    2017 INTERNATIONAL CONFERENCE ON SMART GRID AND ELECTRICAL AUTOMATION (ICSGEA), 2017, : 247 - 250
  • [10] GA-based Resource-Constrained Project Scheduling with the Objective of Minimizing Activities' Cost
    Liu, ZY
    Wang, HW
    ADVANCES IN INTELLIGENT COMPUTING, PT 1, PROCEEDINGS, 2005, 3644 : 937 - 946