Recent innovations by the Arizona Department of Transportation (ADOT) in the area of public relations for highway construction are presented. Explosive population growth in Arizona has pushed ADOT to the limits of its capacity and has challenged ADOT to develop innovative ways to stretch its resources to meet constituents' needs. In 1996 the state legislature passed legislation enacting a pilot design-build program aimed at completing public construction projects more rapidly than could be done by traditional methods. The second project in the program-which involved widening from 6 to 10 lanes 13 km (8 mi) of Interstate 17, a primary artery carrying 180,000 vehicles per day through the city of Phoenix-is described. ADOT established public relations requirements for the design-build contractor, evaluated each proposer's response to those requirements, and then worked with the winning design-build team to administer the public relations program for the project. An important requirement of the program was the use of public opinion surveys performed by the design-builder throughout the project to measure the effectiveness of the public relations program. The survey results provided the basis for a unique financial incentive program used on the project. The results of the public opinion surveys and corresponding incentive payments are presented.
引用
收藏
页码:155 / 164
页数:10
相关论文
共 50 条
  • [21] Benchmarking of large design-build highway projects
    Shrestha, Pramen Prasad
    Migilaccio, Giovanni Ciro
    O'Connor, James T.
    Gibson, G. Edward, Jr.
    TRANSPORTATION RESEARCH RECORD, 2007, (1994) : 17 - 25
  • [23] Critical Comparison of Progressive Design-Build and Construction Manager/General Contractor Project Delivery Methods
    Gransberg, Douglas D.
    Molenaar, Keith R.
    TRANSPORTATION RESEARCH RECORD, 2019, 2673 (01) : 261 - 268
  • [24] Does Design-Build Project Delivery Affect the Future of the Public Engineer?
    Gransberg, Douglas D.
    Molenaar, Keith R.
    TRANSPORTATION RESEARCH RECORD, 2008, (2081) : 3 - 8
  • [25] Naval project goes design-build
    ENR (Engineering News-Record), 1997, 239 (25):
  • [26] An Empirical Comparison of Cost Growth between Highway Design-Bid-Build and Design-Build Projects by Project Size
    Tran, Dai
    Lampe, J. Cameron
    Bypaneni, Sai
    Molenaar, Keith
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2029 - 2038
  • [27] A Comprehensive Analysis of Change Orders Based on Project Progress in Design-Build Highway Construction
    Oh, Jeongyoon
    Touran, Ali
    D'Angelo, Daniel
    Clark, Tyler
    Gaskins, Chris
    Ashuri, Baabak
    CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION, 2024, : 135 - 145
  • [28] Cloud Contractor Selection Model for Design-Build Open Tender
    Martin, Hector
    Ramjarrie, Karrisa
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (04)
  • [29] Design and build - Effects of contractor design on highway schemes - Discussion
    Dalton, D
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-CIVIL ENGINEERING, 1996, 114 (02) : 97 - 97
  • [30] Performance of performance specifications in design-build highway projects
    Brochner, Jan
    Silfwerbrand, Johan
    CONSTRUCTION ECONOMICS AND BUILDING, 2019, 19 (02): : 111 - 125