Optimal response of a power generator to energy, AGC, and reserve pool-based markets

被引:67
作者
Arroyo, JM [1 ]
Conejo, AJ [1 ]
机构
[1] Univ Castilla La Mancha, Dept Ingn Elect Elect & automat, ETSI Ind, E-13071 Ciudad Real, Spain
关键词
AGC market; energy market; mixed-integer optimization; pool-based electricity markets; reserve market;
D O I
10.1109/TPWRS.2002.1007910
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The electric power industry all over the world is undertaking major regulatory and operational changes. The understanding of power supply as a public service is being replaced by the notion that competitive markets constitute a more appropriate framework to supply reliable and cheap electric energy to consumers. As mandated by FERC orders 888 and 889, this paper considers simultaneously energy, AGC, and reserve markets in a pool framework. It provides a tool to enable a power generator to determine optimally its degree of involvement in each one of these markets. A real-world case study is analyzed and results are presented.
引用
收藏
页码:404 / 410
页数:7
相关论文
共 15 条
[1]  
[Anonymous], 1996, PROM WHOL COMP OP AC
[2]  
[Anonymous], 2000, GAMS CPLEX 7 0 USER
[3]   Optimal response of a thermal unit to an electricity spot market [J].
Arroyo, JM ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :1098-1104
[4]   Forecasting energy prices in a competitive market [J].
Bastian, J ;
Zhu, JX ;
Banunarayanan, V ;
Mukerji, R .
IEEE COMPUTER APPLICATIONS IN POWER, 1999, 12 (03) :40-45
[5]   Energy and ancillary service dispatch for the interim ISO New England Electricity Market [J].
Cheung, KW ;
Shamsollahi, P ;
Sun, D ;
Milligan, J ;
Potishnak, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (03) :968-974
[6]   INTEGER PROGRAMMING APPROACH TO THE PROBLEM OF OPTIMAL UNIT COMMITMENT WITH PROBABILISTIC RESERVE DETERMINATION [J].
DILLON, TS ;
EDWIN, KW ;
KOCHS, HD ;
TAUD, RJ .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1978, 97 (06) :2154-2166
[7]  
*FERC, 1996, OP ACC SAM TIM INF S
[8]   Generation scheduling in a deregulated system. The Norwegian case - Discussion [J].
Fotuhi-Firuzabad, M ;
Billinton, R .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (01) :81-81
[9]  
KORENEFF G, 1998, P INT C EN MAN POW D, V1, P223
[10]  
NOGALES FJ, 2001, IEEE T POWER SYS NOV