Dewatering of a 32.55 m Deep Foundation Pit in MAMA Under Leakage Risk Conditions

被引:23
|
作者
Wang, Jianxiu [1 ,2 ,3 ]
Liu, Xiaotian [1 ]
Liu, Jiaxing [1 ]
Wu, Linbo [1 ]
Guo, Qingfeng [1 ]
Yang, Qian [4 ]
机构
[1] Tongji Univ, Coll Civil Engn, Shanghai 200092, Peoples R China
[2] China Univ Min & Technol, State Key Lab Geo Mech & Deep Underground Engn, Xuzhou 221008, Jiangsu, Peoples R China
[3] Tongji Univ, Key Lab Geotech & Underground Engn, Minist Educ, Shanghai 200092, Peoples R China
[4] China MCC20 Grp Co Ltd, Shanghai 201900, Peoples R China
基金
中国国家自然科学基金;
关键词
multi-aquifer and multi-aquitard; foundation pit dewatering; water inrush; field experiment; numerical simulation; PIPING EROSION; CONFINED AQUIFER; SOILS; WATER; SIMULATION; QUICKSAND; WELLS; FLOW;
D O I
10.1007/s12205-017-1950-6
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A 2,250 mm whirlpool foundation pit is located in Donghai Island, Zhanjiang City, Guangdong Province, China. The layers of the island are composed of multi-aquifers and multi-aquitards (MAMA). The aquifers are intersected by partial aquitard lenses. A large confined aquifer is frequently interbedded and separated into several sub-confined aquifers by partial aquitards. In the 2,250 mm foundation pit, the water level of two confined aquifers was reduced to satisfy excavation requirements and prevent water inrush. Construction of the 32.55 m deep foundation pit encountered MAMA and potential defects of the diaphragm wall. The pumping wells in the second confined aquifer were used to reduce the water level to ensure the safety of bottom excavation. The pumping wells in the first confined aquifer were used to reduce the water level under emergency conditions to prevent potential water inrush and piping from the defects of the diaphragm wall. Field pumping tests and numerical simulations were performed to determine the risk of leakage and verify the capability of the pumping wells to reduce the water level. Quicksand occurred during shallow excavation because of leakage although the confined aquifer had been cut off and pumped for a long time. Three pumping wells were installed to reduce the water level. When the foundation pit was excavated to a depth of 24 m, water inrush occurred at the middle of the pit bottom although the water level of the dewatered aquifer had been reduced to below the excavation face. A 90 m deep borehole was found where the underlying confined aquifer below the first aquifer induced the water inrush. Although the upper water level was reduced, the high water level in the deep part still induced water inrush. The pumping wells in the second aquifer were all opened, and the water level of the underlying confined aquifer was reduced. After the water level was reduced to below the pit bottom, the borehole was filled, and the water inrush stopped. However, water inrush occurred on the cracks of the diaphragm wall as predicted. The pre-installed pumping wells were opened to control the water inrush. The deepest foundation pit on the island was constructed successfully after dealing with the water inrush and leakages.
引用
收藏
页码:2784 / 2801
页数:18
相关论文
共 50 条
  • [21] Monitoring analysis and safety evaluation of deep foundation pit under complex conditions
    Zhang, Xutao
    Zhang, Qiangyong
    Wang, Chao
    Wang, Youfa
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 636 - 640
  • [22] Calculation of saturation curve under the action of dewatering and recharge in foundation pit
    Gao Y.
    Dai F.
    Lei B.
    Zeng C.
    Sun H.
    Dizhi Xuebao/Acta Geologica Sinica, 2019, 93 : 127 - 132
  • [23] Optimization of a deep foundation pit dewatering scheme in gypsum-bearing strata
    Ping, Shifei
    Wang, Fugang
    Wang, Donghui
    Li, Shengwei
    Yuan, Yilong
    Wu, Mingjie
    Pan, Huilin
    Cao, Yuqing
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (01)
  • [24] Optimization of dewatering wells in deep foundation pit considering effect of retaining structure
    Wang, Kang-Da, 1600, Chinese Society of Civil Engineering (36):
  • [25] Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
    You, Yang
    Yan, Changhong
    Xu, Baotian
    Liu, Shi
    Che, Canhui
    JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2018, 10 (03) : 555 - 566
  • [26] 3-Dcoupling Numerical Model of Deep Foundation Pit Dewatering Engineering
    Li Yuhua
    Xie Liangwei
    Xiang Lirong
    2010 INTERNATIONAL SYMPOSIUM ON MULTI-FIELD COUPLING THEORY OF ROCK AND SOIL MEDIA AND ITS APPLICATIONS, 2010, : 789 - 793
  • [27] Coupled Numerical Simulation Research on Dewatering and Land Subsidence in Deep Foundation Pit
    Dong Dong Zhang
    APPLIED MECHANICS AND MATERIALS I, PTS 1-3, 2013, 275-277 : 1549 - 1552
  • [28] Optimization of dewatering schemes for a deep foundation pit near the Yangtze River, China
    Yang You
    Changhong Yan
    Baotian Xu
    Shi Liu
    Canhui Che
    Journal of Rock Mechanics and Geotechnical Engineering, 2018, 10 (03) : 555 - 566
  • [29] Numerical simulation of deep foundation pit dewatering and optimization of controlling land subsidence
    Zhou, Nianqing
    Vermeer, Pieter A.
    Lou, Rongxiang
    Tang, Yiqun
    Jiang, Simin
    ENGINEERING GEOLOGY, 2010, 114 (3-4) : 251 - 260
  • [30] Optimization of a deep foundation pit dewatering scheme in gypsum-bearing strata
    Shifei Ping
    Fugang Wang
    Donghui Wang
    Shengwei Li
    Yilong Yuan
    Mingjie Wu
    Huilin Pan
    Yuqing Cao
    Environmental Earth Sciences, 2024, 83