Scheduling algorithm for programmable logic controllers with remote I/Os

被引:1
作者
Jeong, SW
Kim, YS
Kwon, WH
机构
来源
FOURTH INTERNATIONAL WORKSHOP ON REAL-TIME COMPUTING SYSTEMS AND APPLICATIONS, PROCEEDINGS | 1997年
关键词
programmable logic controller; multitasking; response time; scheduling algorithm;
D O I
10.1109/RTCSA.1997.629178
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, a scheduling algorithm is proposed for a programmable logic controller (PLC) with remote I/Os, assuming the multi-tasking facilities. Since sequence programs are executed on the application processor and I/O data are transmitted by the network processor concurrently, the proposed algorithm schedules the data transmission as well as the sequence program execution. The suggested algorithm guarantees the bounded response time, which is the one third of the worst case response time in the absence of scheduling. Computer simulation shows that the algorithm can be easily applied to a real PLC without critical constraints on utilization of resources and inter-relation among tasks.
引用
收藏
页码:87 / 94
页数:8
相关论文
empty
未找到相关数据