Improved Exact Methods for Solving No-Wait Flowshop Scheduling Problems With Due Date Constraints

被引:16
作者
Ying, Kuo-Ching [1 ]
Lu, Chung-Cheng [2 ]
Lin, Shih-Wei [3 ,4 ,5 ]
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 106, Taiwan
[2] Natl Chiao Tung Univ, Dept Transportat & Logist Management, Hsinchu 30010, Taiwan
[3] Chang Gung Univ, Dept Informat Management, Taoyuan 333, Taiwan
[4] Linkou Chang Gung Mem Hosp, Dept Neurol, Taoyuan 333, Taiwan
[5] Ming Chi Univ Technol, Dept Ind Engn & Management, Taipei 243, Taiwan
关键词
Scheduling; no-wait flowshop; due date constraints; mathematical model;
D O I
10.1109/ACCESS.2018.2834954
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The no-wait flowshop scheduling problem with hard due date constraints is critical to operations in many industries, such as plastic, chemical, and pharmaceutical manufacturing. However, to date, there is a lack of effective optimization algorithms for this NP-hard problem. This paper develops a new mixed integer linear programming (MILP) model and a two-phase enumeration algorithm to improve the best-so-far exact methods for solving this problem with the objective of minimizing the makespan. A comprehensive computational experiment is performed to compare the performances of the discussed exact methods. The computational results demonstrate that the proposed MILP model and the two-phase enumeration algorithm significantly outperform the best-so-far optimization methods, and the (sub-) optimal solutions to several unsolved instances from the literature are reported.
引用
收藏
页码:30702 / 30713
页数:12
相关论文
共 50 条
[21]   3/2-approximation for two-machine no-wait flowshop scheduling with availability constraints [J].
Cheng, TCE ;
Liu, ZH .
INFORMATION PROCESSING LETTERS, 2003, 88 (04) :161-165
[22]   A particle swarm optimisation for the no-wait flow shop problem with due date constraints [J].
Samarghandi, Hamed .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (09) :2853-2870
[23]   No-wait flowshop scheduling problem to minimize the number of tardy jobs [J].
Tariq A. Aldowaisan ;
Ali Allahverdi .
The International Journal of Advanced Manufacturing Technology, 2012, 61 :311-323
[24]   No-wait flowshop scheduling problem to minimize the number of tardy jobs [J].
Aldowaisan, Tariq A. ;
Allahverdi, Ali .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 61 (1-4) :311-323
[25]   A HYBRID LOCAL SEARCH ALGORITHM FOR NO-WAIT FLOWSHOP SCHEDULING PROBLEM [J].
Wang, Jing ;
Li, Tieke ;
Zhang, Wenxue .
ICIM 2008: PROCEEDINGS OF THE NINTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2008, :157-163
[26]   No-wait or no-idle permutation flowshop scheduling with dominating machines [J].
Wang J.-B. ;
Xia Z.-Q. .
Journal of Applied Mathematics and Computing, 2005, 17 (1-2) :419-432
[27]   Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion [J].
Wang, Chuyang ;
Li, Xiaoping ;
Wang, Qian .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 206 (01) :64-72
[28]   A survey of scheduling problems with no-wait in process [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 255 (03) :665-686
[29]   A new hybrid ant colony optimization algorithm for solving the no-wait flow shop scheduling problems [J].
Engin, Orhan ;
Guclu, Abdullah .
APPLIED SOFT COMPUTING, 2018, 72 :166-176
[30]   A branch-and-cut approach for the distributed no-wait flowshop scheduling problem [J].
Avci, Mustafa ;
Avci, Mualla Gonca ;
Hamzadayi, Alper .
COMPUTERS & OPERATIONS RESEARCH, 2022, 148