Improved Exact Methods for Solving No-Wait Flowshop Scheduling Problems With Due Date Constraints

被引:16
|
作者
Ying, Kuo-Ching [1 ]
Lu, Chung-Cheng [2 ]
Lin, Shih-Wei [3 ,4 ,5 ]
机构
[1] Natl Taipei Univ Technol, Dept Ind Engn & Management, Taipei 106, Taiwan
[2] Natl Chiao Tung Univ, Dept Transportat & Logist Management, Hsinchu 30010, Taiwan
[3] Chang Gung Univ, Dept Informat Management, Taoyuan 333, Taiwan
[4] Linkou Chang Gung Mem Hosp, Dept Neurol, Taoyuan 333, Taiwan
[5] Ming Chi Univ Technol, Dept Ind Engn & Management, Taipei 243, Taiwan
来源
IEEE ACCESS | 2018年 / 6卷
关键词
Scheduling; no-wait flowshop; due date constraints; mathematical model;
D O I
10.1109/ACCESS.2018.2834954
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The no-wait flowshop scheduling problem with hard due date constraints is critical to operations in many industries, such as plastic, chemical, and pharmaceutical manufacturing. However, to date, there is a lack of effective optimization algorithms for this NP-hard problem. This paper develops a new mixed integer linear programming (MILP) model and a two-phase enumeration algorithm to improve the best-so-far exact methods for solving this problem with the objective of minimizing the makespan. A comprehensive computational experiment is performed to compare the performances of the discussed exact methods. The computational results demonstrate that the proposed MILP model and the two-phase enumeration algorithm significantly outperform the best-so-far optimization methods, and the (sub-) optimal solutions to several unsolved instances from the literature are reported.
引用
收藏
页码:30702 / 30713
页数:12
相关论文
共 50 条