Comparative analysis of 35/10 kV/kV high voltage substation reconstruction alternatives

被引:0
|
作者
Zegarac, Mirjana [1 ]
Skokljev, Ivan [2 ]
机构
[1] Power Distribut Co, Elect Power Ind Serbia, Gospodar Jevremova 28, Belgrade, Serbia
[2] Fac Elect Engn Belgrade, Belgrade, Serbia
来源
PROCEEDINGS OF THE SIXTH IASTED INTERNATIONAL CONFERENCE ON EUROPEAN POWER AND ENERGY SYSTEMS | 2006年
关键词
power distribution systems; power system planning;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In power system planning it is very often necessary to make a decision based on evaluating different project alternatives. When dealing with the problem of high voltage substation reconstructions where part of the substation equipment is old and in bad shape, the question, which arises, is whether it is better to make a partial reconstruction of a substation, or to make total reconstruction, completely with all protection, station and communication computer and all signal cables. The tradeoff is between the amount of investment and the upgraded value of the substation in the long run, assuming the same relative value of substation availability for all analyzed alternatives. The paper presents some details of the five different reconstruction scenarios (case studies) with the accompanying analysis of the actuated cost.