Value stream mapping for identification and assessment of material waste in construction: A case study

被引:31
作者
Vilventhan, Aneetha [1 ]
Ram, V. G. [2 ]
Sugumaran, S. [3 ]
机构
[1] Natl Inst Technol Warangal, Warangal 506004, Telangana, India
[2] Indian Inst Technol Madras, Chennai, Tamil Nadu, India
[3] SRM Univ, Construct Engn & Management, Kattankulathur, India
关键词
Construction waste; estimation; causes of waste generation; waste minimisation; lean construction principles; value stream mapping; DEMOLITION WASTE; GENERATION RATES; MANAGEMENT; GREEN;
D O I
10.1177/0734242X19855429
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Construction sites are plagued with numerous problems, such as improper planning and management, high amounts of waste generation and low awareness of waste reduction. Construction and demolition waste literature provides several best practises and prescriptive strategies that help minimise waste during construction. However, it lacks in the systematic identification and minimisation approach of all possibilities of waste. Therefore, studies focusing on principles and tools that help systematically analyse the inefficiencies of on-site processes leading to waste generation and philosophies addressing waste minimisation are necessary. As eliminating waste is one of the key lean principles, this article discusses the need and importance of integrating the lean construction with the construction and demolition waste management. This article aims to estimate and assess the causes of waste generation in a high-rise building construction through a case study in Chennai city (India) using value stream mapping, a key lean construction tool. Onsite monitoring and measurement were performed to quantify the amount of waste generated. A waste generation rate of 66.26 kg m(-2) was identified, of which concrete, cement mortar and brick waste represented almost 90% of the total construction waste. Direct observation and interviews of site personnel were conducted to understand the causes of waste generation. A strategic framework has been proposed to improve construction and demolition waste minimisation depicting the synergy of combining lean construction principles with construction and demolition waste management strategies. The proposed framework helps in the systematic identification, assessment and minimisation of on-site construction waste generation.
引用
收藏
页码:815 / 825
页数:11
相关论文
共 45 条
  • [1] Critical management practices influencing on-site waste minimization in construction projects
    Ajayi, Saheed O.
    Oyedele, Lukumon O.
    Bilal, Muhammad
    Akinade, Olugbenga O.
    Alaka, Hafiz A.
    Owolabi, Hakeem A.
    [J]. WASTE MANAGEMENT, 2017, 59 : 330 - 339
  • [2] A study on the attitudes and behavioural influence of construction waste management in occupied Palestinian territory
    Al-Sari, Majed I.
    Al-Khatib, Issam A.
    Avraamides, Marios
    Fatta-Kassinos, Despo
    [J]. WASTE MANAGEMENT & RESEARCH, 2012, 30 (02) : 122 - 136
  • [3] Ballard G, 2002, DESIGN CONSTRUCTION, P211
  • [4] Ballard G., 2005, Lean Constr. J, V2, P1
  • [5] Ballard G., 1994, P 2 ANN M INT GROUP
  • [6] Implementing change in construction project organizations: exploring the interplay between structure and agency
    Bresnen, M
    Goussevskaia, A
    Swan, J
    [J]. BUILDING RESEARCH AND INFORMATION, 2005, 33 (06) : 547 - 560
  • [7] Bresnen M., 2001, ENG CONSTR ARCHIT MA, V5/6, P335, DOI DOI 10.1046/J.1365-232X.2001.00216.X
  • [8] A BIM-based system for demolition and renovation waste estimation and planning
    Cheng, Jack C. P.
    Ma, Lauren Y. H.
    [J]. WASTE MANAGEMENT, 2013, 33 (06) : 1539 - 1551
  • [9] Green as the new Lean: how to use Lean practices as a catalyst to greening your supply chain
    Dues, Christina Maria
    Tan, Kim Hua
    Lim, Ming
    [J]. JOURNAL OF CLEANER PRODUCTION, 2013, 40 : 93 - 100
  • [10] Strategies for minimizing construction and demolition wastes in Malaysia
    Esa, Mohd Reza
    Halog, Anthony
    Rigamonti, Lucia
    [J]. RESOURCES CONSERVATION AND RECYCLING, 2017, 120 : 219 - 229