An Integrated Quay Crane Assignment and Scheduling Problem

被引:97
作者
Diabat, Ali [1 ]
Theodorou, Effrosyni [1 ]
机构
[1] Masdar Inst Sci & Technol, Dept Engn Syst & Management, Abu Dhabi, U Arab Emirates
关键词
Quay crane assignment; Quay crane scheduling; Genetic algorithms; Container terminals; Maritime operations; ALGORITHM;
D O I
10.1016/j.cie.2013.12.012
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
As maritime container transport is developing rapidly, the need arises for efficient operations at container terminals. One of the most important determinants of container handling efficiency is the productivity of quay cranes, which are responsible for unloading and loading operations for container vessels. For this reason, the Quay Crane Assignment Problem (QCAP) and the Quay Crane Scheduling Problem (QCSP) have received increasing attention in the literature and the present paper deals with the integration of these interrelated problems. A formulation is developed for the Quay Crane Assignment and Scheduling Problem (QCASP), which accounts for crane positioning conditions and a Genetic Algorithm (GA) is developed to solve the QCASP. Both the model formulation and the solution methodology are presented in detail and computational analysis is conducted in order to evaluate the performance of the proposed GA. The results obtained from the GA are compared with the results from an exact technique, thus providing complete information about the performance of the heuristic in terms of solution quality. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:115 / 123
页数:9
相关论文
共 17 条
[1]  
[Anonymous], P 2008 WINT SIM C
[2]  
Bierwirth C., 2009, FAST HEURISTIC QUAY
[3]   A survey of berth allocation and quay crane scheduling problems in container terminals [J].
Bierwirth, Christian ;
Meisel, Frank .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 202 (03) :615-627
[4]  
Chipperfield A. J., 1995, APPL CONTR TECHN US
[5]   Multiship Crane Sequencing with Yard Congestion Constraints [J].
Choo, Shawn ;
Klabjan, Diego ;
Simchi-Levi, David .
TRANSPORTATION SCIENCE, 2010, 44 (01) :98-115
[6]   A modified genetic algorithm for quay crane scheduling operations [J].
Chung, S. H. ;
Choy, K. L. .
EXPERT SYSTEMS WITH APPLICATIONS, 2012, 39 (04) :4213-4221
[7]   THE CRANE SCHEDULING PROBLEM [J].
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1989, 23 (03) :159-175
[8]  
Guan Y., 2010, ANN OPER RES, V203, P119, DOI DOI 10.1007/S10479-010-0765-3
[9]  
Hiassat A., 2012, INTEGRATED LOCATION
[10]  
Jung DH, 2006, LECT NOTES ARTIF INT, V4293, P461