摘要
This paper is a case study about the gasification system commissioning. After collecting data and information about this system analysis were made, related to TEXACO, SHELL, LURGI and E-GAS, then a flowchart was created. Simulations were made in the ARENA software for verification of commissioning performance. The results showed the importance of commissioning management in a standard commissioning process and other integrated proposed were compared.
引用
收藏
页码:133 / 148
页数:16
相关论文
共 50 条
  • [1] Industrial Plants Commissioning Procedures Using Digital Process-Oriented Architecture
    de Mattos Nascimento, Daniel Luiz
    Brancher Roeder, Alessandra
    Calvetti, Diego
    Menes Mustelier, Alejandro
    Rodrigues Gonzalez, Fernando
    Magno de Araujo, Flavio Ney
    IFAC PAPERSONLINE, 2022, 55 (10): : 2079 - 2084
  • [2] Pre-commissioning, commissioning and start-up of industrial plants and machineries
    Almasi, A.
    AUSTRALIAN JOURNAL OF MECHANICAL ENGINEERING, 2014, 12 (02) : 257 - 263
  • [3] New Hurdles for Integrated Commissioning?
    Banks, Penny
    JOURNAL OF INTEGRATED CARE, 2005, 13 (05) : 21 - 26
  • [4] Industrial substation commissioning and turnover planning
    Bowen, J
    INDUSTRY APPLICATIONS SOCIETY 45TH ANNUAL PETROLEUM AND CHEMICAL INDUSTRY CONFERENCE - RECORD OF CONFERENCE PAPERS, 1998, : 207 - 221
  • [5] Beyond buildability: Operability and commissioning of industrial facilities
    Brito, Maurini Elizardo
    Albergarias Lopes, Raphael de Oliveira
    Rocha, Luiz
    Qualharini, Eduardo Linhares
    PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 67 - 74
  • [6] Owner and contractor solution strategies for industrial commissioning
    Mock, Brant
    O'Connor, James T.
    CONSTRUCTION INNOVATION-ENGLAND, 2019, 19 (02): : 256 - 279
  • [7] Integrated Acute Healthcare Commissioning Pathway in Ireland
    Power, Michael W.
    Cribbin, Derek
    Quill, Una
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2017, 17
  • [8] Responsibilities and accountabilities for industrial facility commissioning and startup activities
    O'Connor, James T.
    Mock, Brant
    CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (04): : 625 - 645
  • [9] Commissioning [Integrated] Care in England: An Analysis of the Current Decision Context
    Gongora-Salazar, Pamela
    Glogowska, Margaret
    Fitzpatrick, Ray
    Perera, Rafael
    Tsiachristas, Apostolos
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2022, 22 (04):
  • [10] Integrated Virtual Commissioning - Model Requirements, Workflows and Case Studies
    Wolf, Gerrit
    Oppelt, Mathias
    Pfleger, Christoph
    Drumm, Oliver
    Pfeffer, Annett
    Urbas, Leon
    ATP EDITION, 2015, (1-2): : 68 - 79