Building Information Modeling Strategy in Mitigating Variation Orders in Roads Projects

被引:6
作者
Abuaddous, Musab [1 ]
Al-Btoosh, Ja'far A. Aldiabat [2 ]
Al-Btoush, Mohammed A. Ka [3 ]
Alkherret, Abdulrazzaq Jawish [2 ]
机构
[1] Yarmouk Univ, Hijjawi Fac Engn Technol, Dept Civil Engn, Irbid, Jordan
[2] Jerash Univ, Dept Civil Engn, Jerash, Jordan
[3] Isra Univ, Fac Engn, Amman, Jordan
来源
CIVIL ENGINEERING JOURNAL-TEHRAN | 2020年 / 6卷 / 10期
关键词
BIM; Cost Overrun; Adoption Strategies; Jordan; BIM; BENEFITS;
D O I
10.28991/cej-2020-03091596
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Most governmental projects in Jordan have cost overrun, it rises during the on-going stage to increase the cost and prolong the time of the project. Unfortunately, until this moment, there is no particular management system in Jordan construction industry to minimize cost overrun and variation order adopted by the government. In contrast, global construction industry has witnessed a huge transformation in terms of the use of digital technologies, particularly Building Information Modeling (BIM) which is a revolutionary digital technology and operation that is reshaping the Architecture, Engineering and Construction (AEC) industry. approach and objectives causes before of this paper are firstly to review the factors contributing to variation orders in governmental road projects in Jordan, secondly, to propose a BIM design applications strategy to minimize variation orders, to achieve the objectives a quantitative approach was followed by distributing a questionnaire, then the data was analyzed statistically using relative importance index, the results were as follow. Our findings suggests that the most important factors causing change orders were as follow: Inaccurate quantity take-off (0.66); Labours or material not meeting the specifications (0.63); Logistic delays (0.60); Internal politics (0.566); and the equipment and tools are not available (0.55). The results also indicate that Contract Parties, Consultant, Contractor and Other Variations had significant positive effects on V. O, whereas the effects of BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection, (BIM Quantity Take-off and Cost Estimation) had a passive impact on V.O. Lastly, BIM has obtained a great reputability by enhancing the productivity in construction society, minimizing the total cost of the projects, and many other benefits.
引用
收藏
页码:1974 / 1982
页数:9
相关论文
共 38 条
[1]  
Abed F.M., 2021, J. Adv. Sci. Eng. Technol., V2, P13
[2]  
Aboushady AM, 2015, AEI 2015 MILW WISC U, DOI [10.1061/9780784479070.039, DOI 10.1061/9780784479070.039]
[3]   Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty [J].
Ahmad, Zubair ;
Thaheem, Muhammad Jamaluddin ;
Maqsoom, Ahsen .
AUTOMATION IN CONSTRUCTION, 2018, 92 :103-119
[4]  
Al-Btoush MAKA, 2019, INT J CIVIL ENG TECH, V10, P343
[5]  
Albtoosh Ja`Far A. Aldibat, 2018, J ENG APPL SCI, V13, P2570
[6]  
Albtoush A.M.F., 2020, INT J CIVIL ENG TECH, V11, P105
[7]  
Alsuliman Jawad Graeme, 2012, CURRENT PRACTICE VAR, P1
[8]   How to measure the benefits of BIM - A case study approach [J].
Barlish, Kristen ;
Sullivan, Kenneth .
AUTOMATION IN CONSTRUCTION, 2012, 24 :149-159
[9]  
Becerik-Gerber B, 2010, J INF TECHNOL CONSTR, V15, P185
[10]  
Boya Ji, 2014, International Journal of Computer Theory and Engineering, V6, P504, DOI 10.7763/IJCTE.2014.V6.918