The Information Integration Mode Research of 500kV Unattended-Operation Substation

被引:0
|
作者
Yi, Yonghui [1 ]
Cao, Yijia [1 ]
Liu, Bo [2 ]
Guo, Chuangxin [1 ]
机构
[1] Zhejiang Univ, Dept Elect Engn, Hangzhou 310027, Peoples R China
[2] Zhejiang Univ, Hangzhou Zhiguang Econ Co Ltd, Hangzhou 310027, Peoples R China
关键词
Substation; Unattended-Operation; Object-Oriented; Dynamic Modeling; Information Integration;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper analyses the current development situation of China's and international 500kV unattended-operation substations (UOS), and discusses the purpose and significance of its implementation. Application systems like Video Surveillance System and Equipment Inspection Robot are Indispensable components of the 500kV UOS. To avoid those application systems become the "information island" which are difficult to share information and have poor extensibility, this paper takes the best aspects of the fiber network construction, Implements object-oriented dynamic modeling technology to establish an information integration platform in the substation, which unifies the external communication interfaces to coordinate the heterogeneous and isolated application systems properly, and indicates the changes of the corresponding management modes in the end.
引用
收藏
页码:1915 / +
页数:2
相关论文
共 50 条
  • [11] Research on Lightning Over-voltage and Lightning Protection of 500kV HGIS Substation
    Wang, Tong
    Fan, Youping
    PROCEEDINGS OF THE 2015 6TH INTERNATIONAL CONFERENCE ON MANUFACTURING SCIENCE AND ENGINEERING, 2016, 32 : 311 - 315
  • [12] Research on the Best Root Span of 500kV Substation Frame Based on Finite Element
    Chen, Hao
    Fang, Qing
    Chen, Haoyuan
    2017 3RD INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND MATERIAL APPLICATION (ESMA2017), VOLS 1-4, 2018, 108
  • [13] Study on Power Calculation Mode for Transformer HV Side of Holeta 500kV Substation in Ethiopia
    Xiong Zaibao
    Liu Qifei
    Zhao Yi
    Zhang Xianfei
    2015 4TH INTERNATIONAL CONFERENCE ON ENERGY AND ENVIRONMENTAL PROTECTION (ICEEP 2015), 2015, : 633 - 637
  • [14] The Application of Communication for Inspection System in 500kV Transformer Substation
    Wang Wenxing
    Chu Qing-he
    ADVANCED RESEARCH ON INFORMATION SCIENCE, AUTOMATION AND MATERIAL SYSTEM, PTS 1-6, 2011, 219-220 : 851 - 854
  • [15] The switching transient electric field measurements in a 500kV substation
    Lu, BX
    Wang, ZZ
    Li, CR
    Ding, LJ
    Wang, W
    Zhang, WD
    2002 3RD INTERNATIONAL SYMPOSIUM ON ELECTROMAGNETIC COMPATIBILITY, 2002, : 194 - 197
  • [16] Discussion on Applications of Network Time Synchronization in 500kV Substation
    Zhao Hai-sheng
    Yang Fan
    Zhou Jian
    12TH ANNUAL MEETING OF CHINA ASSOCIATION FOR SCIENCE AND TECHNOLOGY ON INFORMATION AND COMMUNICATION TECHNOLOGY AND SMART GRID, 2010, : 517 - 524
  • [17] Numerical Analysis of Frequency Electromagnetic Field of 500kV Substation
    Chu, Xiaorui
    ELECTRONIC INFORMATION AND ELECTRICAL ENGINEERING, 2012, 19 : 648 - 652
  • [18] The Anomaly Power Transmission and Analysis at a 500kV GIS Substation
    Qi Geqing
    Wu Gang
    Qi Zhuang
    Meng Fanlong
    Jin Daxin
    Zhang Wei
    Zhang Nan
    Wang Lulu
    4TH INTERNATIONAL CONFERENCE ON MECHANICS AND MECHATRONICS RESEARCH (ICMMR 2017), 2017, 224
  • [19] Optimization Design on 500kV Substation Overhead Concrete Platform
    Qi, Xiao
    Wei, Xiaoguang
    Li, Yanan
    MATERIALS ENGINEERING AND TECHNOLOGY, 2014, 849 : 422 - 426
  • [20] Reconstruction of the 500 kV substation integrated automation system in operation
    Huo, Jian-Bin
    Wu, Guo-Pei
    Huang, Xin
    Dianli Xitong Baohu yu Kongzhi/Power System Protection and Control, 2010, 38 (06): : 133 - 136