Technical-economic analysis of including wind farms and HFC to solve hybrid TNEM-RPM problem in the deregulated environment

被引:3
作者
Shayeghi, H. [1 ,2 ]
Hashemi, Y. [1 ]
机构
[1] Univ Mohaghegh Ardabili, Dept Tech Engn, Ardebil, Iran
[2] Iran Univ Sci & Technol, Dept Elect Engn, Ctr Excellence Power Syst Automat & Operat, Tehran, Iran
关键词
Hybrid TNEM-RPM; RPM; TNEM; HFC; Wind farms; INSGA-II; TRANSMISSION EXPANSION; POWER; VOLTAGE; MODEL; GENERATION; MANAGEMENT; TURBINES; FLOW;
D O I
10.1016/j.enconman.2014.01.011
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper addresses a mathematical model for solving transmission network expansion management (TNEM) associated with reactive power management (RPM) in the presence of double-fed induction generator (DFIG) variable speed wind turbine and hybrid flow controller (HFC). According to this plan, the reactive power capability of DFIG wind turbine is gained and the constraints of deliverable power are derived for each operation point. Strong control capability of the HFC with controlling bus voltage and line power flow offers a great potential for solving many of the problems facing electric utilities. For a precise steady-state analysis of HFC, the injection model is considered which it is an adaptive model in steady-state analysis. The main goals of the proposed management strategy are to minimize investment cost, real power loss cost in transmission lines and voltage deviation and maximize voltage stability index and social benefit at the same time. A three-stage scheme has been developed for solving hybrid TNEM-RPM problem. In the beginning of the plan, it is assumed that all the reactive demands are acquired from local sources and an optimal transmission plan is specified. After transmission lines are constructed, in the second step, reactive power sources will be allocated to weak buses. In order to assess reliability of the system, EENS criterion is used. Due to multi-objective nature of the proposed management method, an improved non-dominated sorting genetic algorithm-II (INSGA-II) style is applied for an optimization procedure. Also, a decision making method based on fuzzy decision making (FDM) is used for finding the best compromise solution from the set of Pareto-solution obtained by INSGA-II technique. In a real power system, Azarbaijan regional power system of Iran, comparative analysis of the results obtained from previous management methods and the proposed approach is represented. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:477 / 490
页数:14
相关论文
共 32 条
[1]   VAR compensation by sequential quadratic programming [J].
Abril, IP ;
Quintero, JAG .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) :36-41
[2]   Multi-objective thermodynamic-based optimization of output power of Solar Dish-Stirling engine by implementing an evolutionary algorithm [J].
Ahmadi, Mohammad H. ;
Mohammadi, Amir H. ;
Dehghani, Saeed ;
Barranco-Jimenez, Marco A. .
ENERGY CONVERSION AND MANAGEMENT, 2013, 75 :438-445
[3]   A multi-stage stochastic transmission expansion planning method [J].
Akbari, Tohid ;
Rahimikian, Ashkan ;
Kazemi, Ahad .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (8-9) :2844-2853
[4]   Transmission expansion planning: A mixed-integer LP approach [J].
Alguacil, N ;
Motto, AL ;
Conejo, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (03) :1070-1077
[5]   A multiobjective approach for reactive power planning in networks with wind power generation [J].
Alonso, Monica ;
Amaris, Hortensia ;
Alvarez-Ortega, Carlos .
RENEWABLE ENERGY, 2012, 37 (01) :180-191
[6]   Coordinated reactive power management in power networks with wind turbines and FACTS devices [J].
Amaris, Hortensia ;
Alonso, Monica .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (07) :2575-2586
[7]   Multiobjective Optimal Location of FACTS Shunt-Series Controllers for Power System Operation Planning [J].
Ara, A. Lashkar ;
Kazemi, A. ;
Niaki, S. A. Nabavi .
IEEE TRANSACTIONS ON POWER DELIVERY, 2012, 27 (02) :481-490
[8]   Optimal location of Hybrid Flow Controller considering modified steady-state model [J].
Ara, A. Lashkar ;
Kazemi, A. ;
Niaki, S. A. Nabavi .
APPLIED ENERGY, 2011, 88 (05) :1578-1585
[9]   Market-based transmission expansion planning [J].
Buygi, MO ;
Balzer, G ;
Shanechi, HM ;
Shahidehpour, M .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2004, 19 (04) :2060-2067
[10]   Multi-objective optimization problem for the Thyristor Controlled Series Compensators placement with multiple decision-making approaches [J].
Christa, S. T. Jaya ;
Venkatesh, P. .
INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2013, 23 (02) :249-269