Maintenance Outsourcing Contracts for New Technology Adoptions

被引:12
作者
Tseng, Fu-Shiang [1 ]
Tang, Kwei [2 ]
Moskowitz, Herbert [2 ]
Plante, Robert [2 ]
机构
[1] Natl Cent Univ, Inst Ind Management, Chungli 32001, Taiwan
[2] Purdue Univ, Krannert Sch Management, W Lafayette, IN 47907 USA
关键词
Contract valuation; maintenance contract; technology adoption; PLANNING HORIZON PROCEDURES; MACHINE REPLACEMENT MODELS; EQUIPMENT REPLACEMENT; INVESTMENT; SYSTEMS;
D O I
10.1109/TEM.2009.2013824
中图分类号
F [经济];
学科分类号
02 ;
摘要
An external contractor receives a payment from a manufacturer for periodically performing preventive maintenance and for performing minimal repairs whenever process failures occur. Suppose a new technology will be available in the future, but the timing is uncertain. We propose specifying one or multiple time points in a maintenance contract, at which the manufacturer can adopt (switch to) the new technology, if it becomes available, and change the preventive maintenance schedule for the remaining time in the contract period. A model is developed to determine the value of using these (switch) points in a maintenance contract to the manufacturer. The numerical results show that, with a higher arrival rate of the new technology, the value becomes greater, and thus, the optimal switch point should be set earlier. Furthermore, if the new technology reduces maintenance costs, using switch points adds more value to a cost-plus-margin method than either the fixed payment or cost-plus-fixed-fee methods. On the other hand, if adopting the new technology results in higher maintenance costs, the value using switch points is higher for the fixed payment method.
引用
收藏
页码:203 / 218
页数:16
相关论文
共 23 条
[11]  
FINE CH, 1993, HDB OPERATIONS MANAG, P711
[12]   MARKOVIAN DETERIORATION AND TECHNOLOGICAL-CHANGE [J].
HOPP, WJ ;
NAIR, SK .
IIE TRANSACTIONS, 1994, 26 (06) :74-82
[13]  
Milgate M., 2001, Alliances, outsourcing, and the lean organization
[14]   Optimal decision making in a maintenance service operation [J].
Murthy, DNP ;
Asgharizadeh, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 116 (02) :259-273
[15]   MODELING STRATEGIC INVESTMENT DECISIONS UNDER SEQUENTIAL TECHNOLOGICAL-CHANGE [J].
NAIR, SK .
MANAGEMENT SCIENCE, 1995, 41 (02) :282-297
[16]  
ROLLINS JD, 2003, HIGH PERFORMANCE OUT
[17]  
Ross SM, 1983, STOCHASTIC PROCESSES
[18]   PLANNING HORIZON PROCEDURES FOR MACHINE REPLACEMENT MODELS [J].
SETHI, S ;
CHAND, S .
MANAGEMENT SCIENCE, 1979, 25 (02) :140-151
[19]  
Simchi-Levi D., 2003, Designing and Managing the Supply Chain: Concepts, Strategies and Case Studies, V2nd ed.
[20]   Incentive maintenance outsourcing contracts for channel coordination and improvement [J].
Tarakci, Hakan ;
Tang, Kwei ;
Moskowitz, Herbert ;
Plante, Robert .
IIE TRANSACTIONS, 2006, 38 (08) :671-684