Wind flow simulation and characteristics prediction using WAsP software for energy planning over the region of Hassi R'mel

被引:6
作者
Meziane, Fares [1 ,2 ]
Chellali, Farouk [3 ]
Mohammedi, Kamal [1 ]
Nouicer, Ilyes [2 ]
Kabouche, Nourdine [2 ]
机构
[1] Univ MHamed Bougara, URMPE MESO, Boumerdes 35000, Algeria
[2] Ctr Dev Energies Renouvelables, Algierss, Algeria
[3] Univ Ziane Achour, Dept Elect Engn, Djelfa, Algeria
关键词
CO2; cost; energy; Hassi R’ mel; hydrogen; potential; predicting; WAsP; HYDROGEN-PRODUCTION; POWER;
D O I
10.1080/15435075.2021.1875470
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this study, we analyzed the wind potential of Hassi R'mel (Algeria) under the Wind Atlas Analysis and Application Program (WAsP) environment, using data measurements at a height of 10 m provided by the National Office of Meteorology (NOM) over the period of 14 years (2003-2017). The results are used as input for predicting wind characteristics (speed and direction) for four other sites covering the studied region where the measurement stations are not available. The pre-feasibility study of large-scale energy and hydrogen production focuses on four sites, namely Telghemt, Delaa, Bouzbier, and Bellil. Two different wind turbine models, Bonus B54 and Nordex N100 with a rated power of 1000 kW and 2500 kW, respectively, were selected. The study pointed out that the region of Hassi R'mel has an important wind potential with an annual mean wind speed of 6.73 m/sec and power density of 365 W/m(2) at 10 m. The maximum of energy and hydrogen produced occurs for the site of Hassi R'mel with 12.41 GWh/yr, and 177.37 tons H-2/yr, with minimal costs of 5.5 c$/kWh, and 18.42 $/kg H-2 respectively using Nordex N100 wind turbine at 100 m. Similarly for the site of Bellil where the maximum of energy and hydrogen production of 5.395 GWh/yr, and 77.08 tons H-2/yr were obtained with minimal costs of 5.06 c$/kWh, and 17.12 $/kg H-2 respectively using Bonus B54 wind turbine at 60 m. Therefore, the high rate of carbon dioxide (CO2) emissions avoided by N100 was 5428.2 tons CO2/kWh for Hassi R'mel, and 2359.2 tons CO2/kWh for Bellil using the B54 wind turbine.
引用
收藏
页码:634 / 644
页数:11
相关论文
共 53 条
[1]  
Ahmadian J, 2013, IEEE CONF CLEAN ENER, P13, DOI 10.1109/CEAT.2013.6775591
[2]  
Aiche-Hamane L., 2007, JITH 2007
[3]  
Aiche-Hamane L., 2003, B SCI G OGRAPHIQUES, V11
[4]   Feasibility study of hydrogen production from wind power in the region of Ghardaia [J].
Aiche-Hamane, Lilia ;
Belhamel, Maiouf ;
Benyoucef, Boumedienne ;
Hamane, Mustapha .
INTERNATIONAL JOURNAL OF HYDROGEN ENERGY, 2009, 34 (11) :4947-4952
[5]   Energy performances and life cycle assessment of an Italian wind farm [J].
Ardente, Fulvio ;
Beccali, Marco ;
Cellura, Maurizio ;
Lo Brano, Valeno .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2008, 12 (01) :200-217
[6]   Electricity generation using wind energy conversion systems in the area of Western Greece [J].
Bagiorgas, H. S. ;
Assimakopoulos, M. N. ;
Theoharopoulos, D. ;
Matthopoulos, D. ;
Mihalakakou, G. K. .
ENERGY CONVERSION AND MANAGEMENT, 2007, 48 (05) :1640-1655
[7]   Simulation and operational assessment for a small autonomous wind-hydrogen energy system [J].
Bechrakis, DA ;
McKeogh, EJ ;
Gallagher, PD .
ENERGY CONVERSION AND MANAGEMENT, 2006, 47 (01) :46-59
[8]   Optimization of the wind turbines location in Kaberten wind farm in Algeria [J].
Benmbarek, Mohamed ;
Benzergua, Fadela ;
Khiat, Mounir .
INTERNATIONAL CONFERENCE ON TECHNOLOGIES AND MATERIALS FOR RENEWABLE ENERGY, ENVIRONMENT AND SUSTAINABILITY -TMREES15, 2015, 74 :122-129
[9]  
Bensaid H., 1985, PROCEEDING WEAC, P21
[10]   Application of artificial neural networks for the wind speed prediction of target station using reference stations data [J].
Bilgili, Mehmet ;
Sahin, Besir ;
Yasar, Abdulkadir .
RENEWABLE ENERGY, 2007, 32 (14) :2350-2360