Field experimental study on the retrofit of cracked onshore wind turbine foundations using externally prestressed anchor bolts

被引:22
作者
He, Minjuan [1 ]
Bai, Xue [1 ]
Ma, Renle [1 ]
Huang, Dongpin [2 ]
Liu, Huiqun [2 ]
机构
[1] Tongji Univ, Dept Civil Engn, 1239 Siping Rd, Shanghai 20092, Peoples R China
[2] Tongji Architectural Design Grp Co Ltd, Shanghai, Peoples R China
关键词
anchor bolts; cracks; external prestressing; onshore wind turbine foundation; retrofitting; POSTTENSIONED ANCHORS; CONCRETE DAMS; DESIGN;
D O I
10.1002/suco.201600186
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Inserted rings are considered as a crucial element of onshore wind turbine foundations to resist uplift and compressive forces at the interface of the steel towers and concrete foundations. These inserted rings can be deficient because of the crushing of the concrete and the occurrence of cracks as the result of the vibration of the tower and the shrinkage of the concrete. Therefore, it is very important to develop an efficient retrofitting system in order to restore the lost capacity and/or even outperform it. The objective of this paper is to develop a retrofit strategy for the deficient foundations using external prestressing technique and verify it using field data. A field test was conducted on two onshore wind turbine foundations with almost the same level of cracks. One of them was retrofitted using externally prestressed anchor bolts after the appearance of cracks, and the other was the control foundation. Strain sensors were installed in the foundation and strain signals were recorded in the period of construction, prestressing, and operation. Field test results showed that the prestressing technique can limit the crack width and improve the section stiffness.
引用
收藏
页码:864 / 875
页数:12
相关论文
共 18 条
[1]  
Afefy HM, 2016, J PERFORM CONSTR FAC, V30
[2]  
[Anonymous], 2011, NEARLY ALL 22 TURBIN
[3]  
[Anonymous], 2015, GLOB WIND REP 2015 T
[4]   Rock engineering design of post-tensioned anchors for dams - A review [J].
Brown, E. T. .
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2015, 7 (01) :1-13
[5]   Structural health monitoring for wind turbine foundations [J].
Currie, Magnus ;
Saafi, Mohamed ;
Tachtatzis, Christos ;
Quail, Francis .
PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENERGY, 2013, 166 (04) :162-169
[6]  
Currie M, 2012, PROCEEDINGS OF THE ASME TURBO EXPO 2012, VOL 6, P859
[7]   Pathology, appraisal, repair and management of old prestressed concrete beam and slab bridges [J].
Godart, Bruno .
STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2015, 11 (04) :501-518
[8]  
Gore IW, 1998, ACI CONCRETE INT, V9, P32
[9]   Seismic Repair of Reinforced Concrete Bridge Columns: Review of Research Findings [J].
He, Ruili ;
Yang, Yang ;
Sneed, Lesley H. .
JOURNAL OF BRIDGE ENGINEERING, 2015, 20 (12)
[10]   Grouting of cracks in concrete dams:: numerical modelling and structural behaviour [J].
Javanmardi, F ;
Léger, P .
PROGRESS IN STRUCTURAL ENGINEERING AND MATERIALS, 2005, 7 (04) :161-173