Performance enhancement of solar tower power plant: A multi-objective optimization approach

被引:41
作者
Awan, Ahmed Bilal [1 ]
Mouli, Kotturu V. V. Chandra [2 ]
Zubair, Muhammad [3 ]
机构
[1] Ajman Univ, Coll Engn & Informat Technol, Dept Elect & Comp Engn, Ajman, U Arab Emirates
[2] Majmaah Univ, Coll Engn, Dept Mech Engn, Almajmaah, Saudi Arabia
[3] Majmaah Univ, Coll Engn, Dept Elect Engn, Almajmaah, Saudi Arabia
关键词
Solar tower plant; Thermal energy storage; Solar multiple; Multi-objective optimization; Particle swarm optimization; LCoE; PARABOLIC TROUGH COLLECTOR; HELIOSTAT FIELD; THERMAL-ENERGY; RECEIVER; DESIGN; STORAGE; SYSTEMS; TECHNOLOGY; GENERATION; MULTIPLE;
D O I
10.1016/j.enconman.2020.113378
中图分类号
O414.1 [热力学];
学科分类号
摘要
The aim of this research is to design, optimize, and evaluate the performance of the solar tower (ST) power plant. The plant is initially designed for solar multiple (SM) of 2, tower height of 190 m and 10 h of full load thermal energy storage (TES). The initial design of the plant is optimized for number of full load storage hours, tower height and SM using multi-objective optimization technique. A fuzzy goal programing approach and an evolutionary computational technique, particle swarm optimization are used. The optimized design parameters converge to SM of 2.7, tower height of 205 m and TES system of 8.7 h. The optimized and initial designs of the plant are compared based on annual and lifetime energy output, capacity utilization factor (CUF), land use factor, solar to electric efficiency, levelized cost of energy (LCoE), and net capital cost (NCC). The main optimization objectives are LCoE and energy output. Although the optimized ST plant design has 13.5% more NCC and 0.9% less solar to electric efficiency, but the optimized design has outperformed the initial design in all the other performance parameters. It has 16.2% better CUF with 35.6% better energy output, 3.1% better land use factor and 16.9% lower LCoE compared to the initial design. The optimized design utilizes the TES system more effectively and it can produce electricity for longer duration after the sunset. It has long average operational hours from 8 am to 3 am as compared to initial design from 8 am to 10 pm.
引用
收藏
页数:13
相关论文
共 54 条
[1]   Comparative study of two configurations of solar tower power for electricity generation in Algeria [J].
Abbas, M. ;
Aburideh, H. ;
Belgroun, Z. ;
Tigrine, Z. ;
Merzouk, N. Kasbadji .
6TH INTERNATIONAL CONFERENCE ON SUSTAINABILITY IN ENERGY AND BUILDINGS, 2014, 62 :337-345
[2]   Performance Assessment and Improvement of Central Receivers Used for Solar Thermal Plants [J].
Albarbar, Alhussein ;
Arar, Abdullah .
ENERGIES, 2019, 12 (16)
[3]  
[Anonymous], 2001, SOLAR POWER TOWER DE, DOI DOI 10.2172/786629
[4]  
[Anonymous], 2017, INT J CURRENT ENG TE
[5]  
[Anonymous], 2015, AM J ENERGY ENG
[6]  
[Anonymous], 2001, POWER FROM THE SUN
[7]   Evaluation of the potential of central receiver solar power plants: Configuration, optimization and trends [J].
Avila-Marin, Antonio L. ;
Fernandez-Reche, Jesus ;
Tellez, Felix M. .
APPLIED ENERGY, 2013, 112 :274-288
[8]   Design, optimization and performance comparison of solar tower and photovoltaic power plants [J].
Awan, Ahmed Bilal ;
Zubair, Muhammad ;
Mouli, Kotturu V. V. Chandra .
ENERGY, 2020, 199
[9]   Design and comparative analysis of photovoltaic and parabolic trough based CSP plants [J].
Awan, Ahmed Bilal ;
Zubair, Muhammad ;
Praveen, R. P. ;
Bhatti, Abdul Rauf .
SOLAR ENERGY, 2019, 183 :551-565
[10]   Solar radiation attenuation in solar tower plants [J].
Ballestrin, Jesus ;
Marzo, Aitor .
SOLAR ENERGY, 2012, 86 (01) :388-392