SIMULATION OF LOW-VOLUME MIXED MODEL ASSEMBLY LINES: MODELING ASPECTS AND CASE STUDY

被引:0
|
作者
Ziarnetzky, Timm [1 ]
Moench, Lars [1 ]
Biele, Alexander [2 ]
机构
[1] Univ Hagen, Dept Math & Comp Sci, Univ Str 1, D-58097 Hagen, Germany
[2] AIRBUS Grp Innovat, Syst Engn Informat Technol & Appl Math, D-21129 Hamburg, Germany
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider the modeling and simulation of low-volume mixed model assembly lines that can be found in the aerospace industry. Low-volume mixed model assembly processes are characterized by a large amount of tasks to be manually performed, buffer space constraints, specialized resources like jigs and tools, and a large number of external suppliers. The main principles of modeling and simulating such manufacturing systems are discussed. Based on a domain analysis, the major building blocks of simulation models for low-volume mixed model assembly lines are derived. We exemplify their implementation using the commercial discrete-event simulation tool AutoSched AP. As an application of these building blocks, we analyze the cabin installation process in a final assembly line in aircraft production using discrete-event simulation.
引用
收藏
页码:2101 / 2112
页数:12
相关论文
共 50 条
  • [1] Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing
    Biele, Alexander
    Moench, Lars
    JOURNAL OF HEURISTICS, 2018, 24 (01) : 49 - 81
  • [2] Hybrid approaches to optimize mixed-model assembly lines in low-volume manufacturing
    Alexander Biele
    Lars Mönch
    Journal of Heuristics, 2018, 24 : 49 - 81
  • [3] Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry
    Heike, G
    Ramulu, M
    Sorenson, E
    Shanahan, P
    Moinzadeh, K
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2001, 72 (02) : 103 - 120
  • [4] Work planning in low-volume assembly lines under ergonomic constraints
    Arkhipov, Dmitry
    Battaia, Olga
    Cegarra, Julien
    Lazarev, Alexander
    51ST CIRP CONFERENCE ON MANUFACTURING SYSTEMS, 2018, 72 : 786 - 789
  • [5] Robot Excels at Low-Volume Assembly
    Brown, Alan S.
    MECHANICAL ENGINEERING, 2009, 131 (01) : 18 - 18
  • [6] Modeling low-volume road erosion
    Elliot, William J.
    Foltz, Randy B.
    Luce, Charles H.
    Transportation Research Record, 1999, 2 (1652): : 244 - 249
  • [7] SPC IN LOW-VOLUME MANUFACTURING - A CASE-STUDY
    KOONS, GF
    LUNER, JJ
    JOURNAL OF QUALITY TECHNOLOGY, 1991, 23 (04) : 287 - 295
  • [8] Modeling low-volume road erosion
    Elliot, WJ
    Foltz, RB
    Luce, CH
    SEVENTH INTERNATIONAL CONFERENCE ON LOW-VOLUME ROADS 1999, VOL 2: PLANNING, ADMINISTRATION, AND ENVIRONMENT; DESIGN; MATERIALS, CONSTRUCTION, AND MAINTENANCE; OPERATIONS AND SAFETY, 1999, (1652): : 244 - 249
  • [9] Modeling and Simulation of CONWIP Systems for Low-volume But More-varieties Products
    Kang Jie
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING, 2010, : 237 - 243
  • [10] Modeling of Manufacturing Complexity in Mixed-Model Assembly Lines
    Zhu, Xiaowei
    Hu, S. Jack
    Karen, Yoram
    Marin, Samue P.
    JOURNAL OF MANUFACTURING SCIENCE AND ENGINEERING-TRANSACTIONS OF THE ASME, 2008, 130 (05): : 0510131 - 05101310