Review of Public-Private Partnership Literature from a Project Lifecycle Perspective

被引:58
作者
Bao, Fengyu [1 ,2 ]
Chan, Albert P. C. [1 ]
Chen, Chuan [3 ]
Darko, Amos [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Kowloon 999077, Hong Kong, Peoples R China
[2] Sichuan Univ, Inst Disaster Management & Reconstruct, Chengdu 610065, Sichuan, Peoples R China
[3] Sichuan Univ, Business Sch, 29 Jiuyanqiao Wangjiang Rd, Chengdu 610065, Sichuan, Peoples R China
关键词
Public-private partnership; Project life cycle; Phases; Transfer; Literature review; BUILD-OPERATE-TRANSFER; CRITICAL SUCCESS FACTORS; INFRASTRUCTURE PROJECTS; CONSTRUCTION JOURNALS; PPP PROJECTS; CONCESSION PERIOD; RESEARCH TREND; VIABILITY ANALYSIS; BOT CONTRACTS; MODEL;
D O I
10.1061/(ASCE)IS.1943-555X.0000424
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The process of developing a public-private partnership (PPP) is complex and dynamic throughout the project's life cycle of project identification, preparation, procurement, implementation, transfer, and posttransfer phases. Although interests in reviewing general trends and diverse topics of the PPP literature have increased over the years, there is a lack of a systematic review of the PPP literature from the perspective of project life cycle. The purpose of this study is to analyze the research status and possible future studies from the viewpoint of project life cycle. The review is conducted by searching related papers from seven leading construction management journals, then classifying them into distinct phases to facilitate further discussion on significant research topics. The findings show that different PPP phases encounter different problems, attracting uneven attention from researchers. Specifically, the transfer phase, which is the end of PPP contract life cycle and the starting point of posttransfer operation, requires systematic research in the future. The outcomes of this study reveal the relationship between important project problems and corresponding PPP phases, which may serve as valuable reference for PPP participants to develop effective project management strategies, and for PPP researchers to better understand PPP research with specific focus on varied PPP phases.
引用
收藏
页数:12
相关论文
共 108 条
[1]   Unraveling of BOT scheme: Malaysia's Indah Water Konsortium [J].
Abdul-Aziz, AR .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06) :457-460
[2]  
ADB (Asian Development Bank), 2008, PUBL PRIV HDB
[3]  
Ahadzi Marcus., 2004, CONSTR MANAG ECON, V22, P967, DOI [10.1080/0144619042000241471, DOI 10.1080/0144619042000241471]
[4]   Build-operate-transfer in infrastructure projects in the United States [J].
Algarni, Ayed Muhammad ;
Arditi, David ;
Polat, Gul .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2007, 133 (10) :728-735
[5]   A Fuzzy Approach for the Allocation of Risks in Public-Private Partnership Water-Infrastructure Projects in Developing Countries [J].
Ameyaw, Ernest Effah ;
Chan, Albert P. C. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2016, 22 (03)
[6]  
[Anonymous], 2014, PUBLIC PRIVATE PARTN
[7]  
[Anonymous], 2021, GUID PROJ MAN BOD KN, V7th
[8]  
Ashley David., 1998, J INFRASTRUCT SYST, V4, P102
[9]   Risk-Neutral Pricing Approach for Evaluating BOT Highway Projects with Government Minimum Revenue Guarantee Options [J].
Ashuri, B. ;
Kashani, H. ;
Molenaar, K. R. ;
Lee, S. ;
Lu, J. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2012, 138 (04) :545-557
[10]   Generalized Economic Modeling for Infrastructure and Capital Investment Projects [J].
Aziz, Ahmed M. Abdel ;
Russell, Alan D. .
JOURNAL OF INFRASTRUCTURE SYSTEMS, 2006, 12 (01) :18-32