Application of Fuzzy Modelling to Predict Construction Projects Cash Flow

被引:25
作者
Tabei, Sayed Mohammad Amin [1 ]
Bagherpour, Morteza [2 ]
Mahmoudi, Amin [3 ]
机构
[1] Univ Econ Sci, Dept Financial Engn, Tehran, Iran
[2] Iran Univ Sci & Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Dept Ind Engn, Shiraz Branch, Shiraz, Iran
来源
PERIODICA POLYTECHNICA-CIVIL ENGINEERING | 2019年 / 63卷 / 02期
关键词
cash flow; fuzzy sets; predict cash flow; project management; construction projects; COST; TIME; OPTIMIZATION; SENSITIVITY; INVESTMENT; MANAGEMENT; DURATION; QUALITY; RISK;
D O I
10.3311/PPci.13402
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction project managers are always looking for methods for forecasting future projects and preventing of potential delays in the project. One of the most crucial requirements of construction project managers and financial planners is awareness of project cash flow and financial status. On the other hand, the unique properties of construction projects with uncertainties such as activity duration, the variability of resources, material costs and also ambiguity in the employer's payments are factors that have an effect on the correct prediction of project cash flow. Hence, the project team should examine project cash flow under uncertainty environment. There are many approaches for considering uncertainty such as fuzzy sets, interval theory, rough and grey system. But the most well-known approach is fuzzy sets which has wide applications in engineering and management. Hence in this paper, we proposed a new method for forecasting project cash flow under fuzzy environment. Finally, the proposed method was applied on an "Engineering, Procurement and Construction"(EPC) project and it is demonstrated that the proposed model has a high performance in the prediction of project cash flow.
引用
收藏
页码:647 / 659
页数:13
相关论文
共 51 条
[1]  
Alinaitwe H, 2013, J CONSTR DEV CTRIES, V18, P33
[2]   The cash flow sensitivity of cash [J].
Almeida, H ;
Campello, M ;
Weisbach, MS .
JOURNAL OF FINANCE, 2004, 59 (04) :1777-1804
[3]   How sensitive is investment to cash flow when financing is frictionless? [J].
Alti, A .
JOURNAL OF FINANCE, 2003, 58 (02) :707-722
[4]   The impact of contractors' attributes on construction project success: A post construction evaluation [J].
Alzahrani, Jaman I. ;
Emsley, Margaret W. .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2013, 31 (02) :313-322
[5]  
[Anonymous], 2013, GUIDE PROJECT MANAGE, V5
[6]   Asymmetric cash flow sensitivity of cash holdings [J].
Bao, Dichu ;
Chan, Kam C. ;
Zhang, Weining .
JOURNAL OF CORPORATE FINANCE, 2012, 18 (04) :690-700
[7]   Nonlinear optimisation and rational cash flow [J].
Beran, Vaclav ;
Dlask, Petr .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (03) :277-+
[8]   Direct and indirect costs of diabetes mellitus in Mali: A case-control study [J].
Bermudez-Tamayo, Clara ;
Besancon, Stephane ;
Johri, Mira ;
Assa, Sidibe ;
Brown, Jonathan Betz ;
Ramaiya, Kaushik .
PLOS ONE, 2017, 12 (05)
[9]   Office building deep energy retrofit: life cycle cost benefit analyses using cash flow analysis and multiple benefits on project level [J].
Bleyl, Jan W. ;
Bareit, Markus ;
Casas, Miguel A. ;
Chatterjee, Souran ;
Coolen, Johan ;
Hulshoff, Albert ;
Lohse, Ruediger ;
Mitchell, Sarah ;
Robertson, Mark ;
Urge-Vorsatz, Diana .
ENERGY EFFICIENCY, 2019, 12 (01) :261-279
[10]   Where do we stand with fuzzy project scheduling? [J].
Bonnal, P ;
Gourc, D ;
Lacoste, G .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (01) :114-123