A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost

被引:45
作者
Pasandideh, Seyed Hamid Reza [1 ]
Niaki, Seyed Taghi Akhavan [2 ]
Nobil, Amir Hossein [3 ]
Eduardo Cardenas-Barron, Leopoldo [4 ]
机构
[1] Kharazmi Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Sharif Univ Technol, Dept Ind Engn, Tehran, Iran
[3] Islamic Azad Univ, Fac Mech & Ind Engn, Qazvin Branch, Qazvin, Iran
[4] Sch Engn & Sci Tecnol Monterrey, Monterrey 64849, Nuevo Leon, Mexico
关键词
Inventory control; EPQ; NLP model; Nonconforming items; Convex programming; Exact solution; STAGE MANUFACTURING SYSTEM; EPQ MODEL; REWORK PROCESS; BACKORDERS; TIME;
D O I
10.1016/j.ijpe.2015.08.004
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper develops an economic production quantity (EPQ) inventory model for a multiproduct single-machine lot-sizing problem with nonconforming items including scrap and rework, where reworks are classified into several groups based on failure severity. In this inventory model, shortage is allowed and is backordered. The aim is to determine the optimal period length, the lot size, and the allowable shortage of each product so as the total cost, including setup, production, warehouse construction, holding, shortage, reworking, and disposal is minimized. Besides, the available total budget is scarce and that there is a lower bound on the service level of each product. While the convexity is proved, an exact method is proposed to solve the nonlinear programming problem. A numerical example is provided at the end to demonstrate the applicability of the proposed solution procedure as well as to perform a sensitivity analysis. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:203 / 214
页数:12
相关论文
共 32 条
[1]   Time-limited free back-orders EOQ model [J].
Abboud, NE ;
Sfairy, RG .
APPLIED MATHEMATICAL MODELLING, 1997, 21 (01) :21-25
[2]   Review of inventory systems with deterioration since 2001 [J].
Bakker, Monique ;
Riezebos, Jan ;
Teunter, Ruud H. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 221 (02) :275-284
[3]   Effects of imperfect products on lot sizing with work in process inventory [J].
Barzoki, Morteza Rasti ;
Jahanbazi, Morteza ;
Bijari, Mehdi .
APPLIED MATHEMATICS AND COMPUTATION, 2011, 217 (21) :8328-8336
[4]   Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns [J].
Chiu, Singa Wang ;
Wang, Shan-Ling ;
Chiu, Yuan-Shyi Peter .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (02) :664-676
[5]  
Covert R. P., 1973, AIIE Transactions, V5, P323, DOI 10.1080/05695557308974918
[6]   Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process [J].
Dey, O. ;
Gini, B. C. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 155 :222-228
[7]   Economic production quantity with rework process at a single-stage manufacturing system with planned backorders [J].
Eduardo Cardenas-Barron, Leopoldo .
COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) :1105-1113
[8]   An economic order quantity model with defective items and shortages [J].
Eroglu, Abdullah ;
Ozdemir, Gultekin .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 106 (02) :544-549
[9]  
Ghare PM, 1963, J Ind Eng, V14, P238
[10]   Recent trends in modeling of deteriorating inventory [J].
Goyal, SK ;
Giri, BC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 134 (01) :1-16