Simultaneous batching and scheduling for chemical processing with earliness and tardiness penalties

被引:0
作者
Dessouky, M [1 ]
Kijowski, B
Verma, S
机构
[1] Univ So Calif, Dept Ind & Syst Engn, Los Angeles, CA 90089 USA
[2] 12 Technol, Redwood City, CA 94065 USA
关键词
chemical processing; batching; scheduling; weighted earliness/tardiness;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of determining the allocation of demand from different customer orders to production batches and the schedule of resulting batches to minimize the total weighted earliness and tardiness penalties in context of batch chemical processing. The problem is formulated as a mixed-integer nonlinear programming model. An iterative heuristic procedure that makes use of the network nature of the problem formulation is presented to approximate an optimal solution. An algorithm polynomial in the number of batches to produce is also presented that optimally solves the problem under special cost structures.
引用
收藏
页码:433 / 444
页数:12
相关论文
共 22 条
[1]   SEQUENCING WITH EARLINESS AND TARDINESS PENALTIES - A REVIEW [J].
BAKER, KR ;
SCUDDER, GD .
OPERATIONS RESEARCH, 1990, 38 (01) :22-36
[2]   SIMULTANEOUS PRODUCTION PLANNING AND SCHEDULING IN MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1990, 29 (04) :570-580
[3]   ON A PROBLEM OF PRODUCTION SCHEDULING [J].
BISHOP, GT .
OPERATIONS RESEARCH, 1957, 5 (01) :97-103
[4]  
CHAUDHARY J, 1988, CHEM ENG, V95, P31
[5]  
Dessouky MM, 1997, IIE TRANS, V29, P399
[6]   Scheduling multi-purpose batch plants with junction constraints [J].
Dessouky, YM ;
Roberts, CA ;
Dessouky, MM ;
Wilson, G .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (02) :525-541
[7]   OPTIMAL-DESIGN OF BATCH PLANTS WITH SINGLE PRODUCTION ROUTES [J].
FAQIR, NM ;
KARIMI, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1989, 28 (08) :1191-1202
[8]  
Francis R.L., 1992, FACILITY LAYOUT LOCA
[9]   A COMPARISON OF 2 LOT SIZING-SEQUENCING HEURISTICS FOR THE PROCESS INDUSTRY [J].
HEUTS, RMJ ;
SEIDEL, HP ;
SELEN, WJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1992, 59 (03) :413-424
[10]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227