Buffer size design linked to reliability performance: A simulative study

被引:44
作者
Battini, D. [1 ]
Persona, A. [1 ]
Regattieri, A. [2 ]
机构
[1] Univ Padua, Dept Management & Engn, I-36100 Vicenza, Italy
[2] Univ Bologna, Dept Ind & Mech Plants, I-40136 Bologna, Italy
关键词
Buffer design; Availability; New paradigm; Cross matrix; Simulation; Productivity; PRODUCTION LINE SYSTEMS; ASSEMBLY SYSTEMS; OPTIMAL ALLOCATION; OPTIMIZATION; INVENTORY; TIMES; MAINTENANCE; SPACE; WORK;
D O I
10.1016/j.cie.2008.10.020
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Material flow along a Flow Production Line may be disrupted by machine failures or variable processing times. In particular, Automatic Flow Production Lines are often affected by the presence of micro-down-times (i.e. speed losses due to work-pieces blocking or congestion, momentary stiff or stuck pieces on machines, etc.), which can penalize the productivity of the system and increase losses in availability for the whole plant. Moreover, micro-breakdowns cause inability of the system not to respond to sudden changes in demand due to capacity restrictions. Intermediate buffers built between the various machines in an asynchronous automatic (or semi-automatic) production line may increase the reliability of the whole system by limiting the consequences of micro-downtime, and saving companies from making inadequate purchases of oversized equipment. In this paper a new efficiency simulative study for the allocation of storage capacity in serial production lines is developed and a new experimental cross matrix is provided as a tool to determine the optimal buffer size. Thus, this research studies the relationship of machines' availability and buffers size, in order to stress a new paradigm: the buffer design for availability (BDFA). Using a simulation approach, this paper describes the effects of workstation reliability parameters on buffer capacity level, developing a set of simple guidelines to support and help designers and practitioners in the rapid and robust buffer design issue. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1633 / 1641
页数:9
相关论文
共 42 条
  • [1] Buffer allocation plan for a remanufacturing cell
    Aksoy, HK
    Gupta, SA
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 48 (03) : 657 - 677
  • [2] ANDERSON DR, 1969, INT J PRODUCTIONS, V3
  • [3] Chiadamrong N., 2003, International Journal of Manufacturing Technology and Management, V5, P149, DOI 10.1504/IJMTM.2003.002538
  • [4] CHOW WM, 1987, INT J PROD RES, V25, P1183
  • [5] THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES
    CONWAY, R
    MAXWELL, W
    MCCLAIN, JO
    THOMAS, LJ
    [J]. OPERATIONS RESEARCH, 1988, 36 (02) : 229 - 241
  • [6] ENGINARLAR E, 2002, INT J PRODUCTION RES, V38
  • [7] Efficient algorithms for buffer space allocation
    Gershwin, SB
    Schor, JE
    [J]. ANNALS OF OPERATIONS RESEARCH, 2000, 93 (1-4) : 117 - 144
  • [8] GERSHWIN SB, 1995, LMP95005 MIT LAB MAN
  • [9] Gutowski T, 2005, INVENTORY BUFFER SIZ
  • [10] Cash-flow-oriented buffer allocation in stochastic flow lines
    Helber, S
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (14) : 3061 - 3083