Accumulative effect of discomfort index for fuzzy short-term load forecasting

被引:0
|
作者
Mori, H [1 ]
Sone, Y
Moridera, D
Kondo, T
机构
[1] Meiji Univ, Dept Elect & Elect Engn, Tama Ku, Kawasaki, Kanagawa 2148571, Japan
[2] Chubu Elect Power Co Inc, Cent Load Dispatching Ctr, Higashi Ku, Nagoya, Aichi 4618680, Japan
来源
ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS | 2002年 / 10卷 / 02期
关键词
simplified fuzzy inference; load forecasting; discomfort index; meta-heuristics; tabu search;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper proposes a simplified fuzzy inference model for short-term load forecasting in power systems. The simplified fuzzy model is tuned up with tabu search and supervised learning. The proposed method uses tabu search for optimizing the location and number of the fuzzy membership functions. Tabu search is one of meta-heuristic methods that give better solution in a sense of global optimization. Supervised learning is introduced to give better fuzzy inference results. In the proposed model, selection of an input variable is addressed to give an insight into the accumulative effect of the discomfort index with delay. The proposed model is applied to real data and the effectiveness is demonstrated.
引用
收藏
页码:107 / 113
页数:7
相关论文
共 50 条
  • [1] Accumulative effect of discomfort index for fuzzy short-term load forecasting
    Mori, H
    Sone, Y
    Moridera, D
    Kondo, T
    ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 1999, 7 (04): : 233 - 238
  • [2] A Neural Network Short-Term Load Forecasting Considering Human Comfort Index and its Accumulative Effect
    Dai, Menting
    Yu, Zhanqing
    Zeng, Rong
    Zhuang, Chijie
    Hu, Jun
    Li, Tongzhi
    Liu, Jidong
    Zhu, Weiyi
    2013 NINTH INTERNATIONAL CONFERENCE ON NATURAL COMPUTATION (ICNC), 2013, : 262 - 266
  • [3] A simplified fuzzy inference method with tabu search for short-term load forecasting in power systems
    Mori, H
    Sone, Y
    PROCEEDINGS OF THE 37TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1998, : 4240 - 4245
  • [4] An integrated method of fuzzy data mining and fuzzy inference for short-term load forecasting
    Mori, H
    Sakatani, Y
    Fujino, T
    Numa, K
    ENGINEERING INTELLIGENT SYSTEMS FOR ELECTRICAL ENGINEERING AND COMMUNICATIONS, 2005, 13 (02): : 73 - 79
  • [5] FUZZY EXPERT SYSTEMS - AN APPLICATION TO SHORT-TERM LOAD FORECASTING
    HSU, YY
    HO, KL
    IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1992, 139 (06) : 471 - 477
  • [6] The Short-term Load Forecasting by Applying the Fuzzy Neural Net
    Wang Xiao-Wen
    Fu Xuan
    Sun Xiao-Yu
    Wu Zhi-Hong
    2013 6TH INTERNATIONAL CONFERENCE ON INTELLIGENT NETWORKS AND INTELLIGENT SYSTEMS (ICINIS), 2013, : 178 - 180
  • [7] SHORT-TERM LOAD FORECASTING USING FUZZY NEURAL NETWORKS
    BAKIRTZIS, AG
    THEOCHARIS, JB
    KIARTZIS, SJ
    SATSIOS, KJ
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1995, 10 (03) : 1518 - 1524
  • [8] Short-term electric load forecasting based on a neural fuzzy network
    Ling, SH
    Leung, FHF
    Lam, HK
    Tam, PKS
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2003, 50 (06) : 1305 - 1316
  • [9] Research on the Short-term Electric Load Forecasting Based on Fuzzy Rules
    Liu, Tongna
    Zhang, Qian
    THIRD INTERNATIONAL CONFERENCE ON KNOWLEDGE DISCOVERY AND DATA MINING: WKDD 2010, PROCEEDINGS, 2010, : 179 - 181
  • [10] Short-term load forecasting with fuzzy regression tree in power systems
    Mori, H
    Kosemura, N
    Ishiguro, K
    Kondo, T
    2001 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS, VOLS 1-5: E-SYSTEMS AND E-MAN FOR CYBERNETICS IN CYBERSPACE, 2002, : 1948 - 1953