Civil Integrated Management: An Emerging Paradigm for Civil Infrastructure Project Delivery and Management

被引:25
作者
Guo, Fangyu [1 ]
Jahren, Charles T. [2 ]
Turkan, Yelda [3 ]
Jeong, H. David [4 ]
机构
[1] Iowa State Univ, Dept Civil Construct & Environm Engn, 136 Town Engn Bldg, Ames, IA 50011 USA
[2] Iowa State Univ, Dept Civil Construct & Environm Engn, 456 Town Engn Bldg, Ames, IA 50011 USA
[3] Iowa State Univ, Dept Civil Construct & Environm Engn, 428 Town Engn Bldg, Ames, IA 50011 USA
[4] Iowa State Univ, Dept Civil Construct & Environm Engn, 404 Town Engn Bldg, Ames, IA 50011 USA
关键词
Civil integrated management (CIM); Three-dimensional (3D) engineered models; Transportation data asset; Qualitative research; POINT CLOUD DATA; CONSTRUCTION SAFETY;
D O I
10.1061/(ASCE)ME.1943-5479.0000491
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With the advancement of various technologies, transportation agencies are transitioning from two-dimensional (2D) paper-based to three-dimensional (3D) digital data-based project delivery. This transition results in an increasing amount of digital data exchange throughout the project delivery process, and a holistic framework is required to better manage data for improved decision making. A recently developed concept, civil integrated management (CIM) could potentially assist transportation agencies to transition to digital data-based project and program delivery by providing appropriate stakeholder access to an agency-wide data pool. The purpose of this paper is to further define this vision and concept and establish an initial framework for CIM implementation. An extensive amount of information was collected through two weeks of on-site visits to seven transportation agencies in the United States on their current CIM-related practices. The results obtained from using qualitative research methods are expected to serve as a foundation for further investigation on CIM-related practices and to provide a roadmap for CIM implementation.
引用
收藏
页数:10
相关论文
共 37 条
[1]  
AASHTO, 2015, GEOGR INF SYST GIS
[2]   A Qualitative Data Analysis for Supplier Quality-Management Practices for Engineer-Procure-Construct Projects [J].
AlMaian, Rufaidah Y. ;
Needy, Kim LaScola ;
Walsh, Kenneth D. ;
Alves, Thais da C. L. .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (02)
[3]   Intelligent compaction with vibratory rollers - Feedback control systems in automatic compaction and compaction control [J].
Anderegg, R ;
Kaufmann, K .
SOIL MECHANICS 2004, 2004, (1868) :124-134
[4]   Ubiquitous location tracking for context-specific information delivery on construction sites [J].
Behzadan, Amir H. ;
Aziz, Zeeshan ;
Anumba, Chimay J. ;
Kamat, Vineet R. .
AUTOMATION IN CONSTRUCTION, 2008, 17 (06) :737-748
[5]  
Bogdan R., 2007, Qualitative Research of Education: An Introductive to Theories and Methods, V5th ed.
[6]  
Chang G., 2011, ACCELERATED IMPLEMEN
[7]  
FHWA AASHTO ARTBA & AGC., 2013, CIV INT MAN
[8]  
FHWA (Federal Highway Administration), 2011, SUE BROCH
[9]  
FHWA (Federal Highway Administration), 2012, EDC 2012 IN CONSTR M
[10]  
FHWA (Federal Highway Administration), 2014, APPL 3D MOD CONSTR S