Cost overruns and financial risk in the construction of nuclear power reactors: A critical appraisal

被引:47
|
作者
Gilbert, Alexander [1 ]
Sovacool, Benjamin K. [2 ,3 ]
Johnstone, Phil [2 ]
Stirling, Andy [2 ]
机构
[1] Spark Lib, Washington, DC 89431 USA
[2] Univ Sussex, Sch Business Management & Econ, Sci Policy Res Unit SPRU, Brighton, E Sussex, England
[3] Aarhus Univ, Ctr Energy Technol, Dept Business Dev & Technol, Birk Centerpark 15, Aarhus, Denmark
关键词
Construction cost overrun; Nuclear power; Nuclear energy; Atomic energy; ENERGY;
D O I
10.1016/j.enpol.2016.04.001
中图分类号
F [经济];
学科分类号
02 ;
摘要
Lovering and colleagues attempt to advance understanding of construction cost escalation risks inherent in building nuclear reactors and power plants, a laudable goal. Although we appreciate their focus on capital cost increases and overruns, we maintain in this critical appraisal that their study conceptualizes cost issues in a limiting way. Methodological choices in treating different cost categories by the authors mean that their conclusions are more narrowly applicable than they describe. We also argue that their study is factually incorrect in its criticism of the previous peer-reviewed literature. Earlier work, for instance, has compared historical construction costs for nuclear reactors with other energy sources, in many countries, and extending over several decades. Lastly, in failing to be transparent about the limitations of their own work, Lovering et al. have recourse to a selective choice of data, unbalanced analysis, and biased interpretation. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:644 / 649
页数:6
相关论文
共 8 条
  • [1] A reply to "Historical construction costs of global nuclear power reactors"
    Koomey, Jonathan
    Hultman, Nathan E.
    Grubler, Arnulf
    ENERGY POLICY, 2017, 102 : 640 - 643
  • [2] Emerging small modular nuclear power reactors: A critical review
    Hussein, Esam M. A.
    PHYSICS OPEN, 2020, 5
  • [3] How much can nuclear power reduce climate mitigation cost? - Critical parameters and sensitivity
    Lehtveer, Mariliis
    Hedenus, Fredrik
    ENERGY STRATEGY REVIEWS, 2015, 6 : 12 - 19
  • [4] Radiation Workers and Risk Perceptions: Low Dose Radiation, Nuclear Power Production, and Small Modular Nuclear Reactors
    Hurlbert, Margot
    Shasko, Larissa
    Condor, Jose
    Landrie-Parker, Dazawray
    JOURNAL OF NUCLEAR ENGINEERING, 2023, 4 (01): : 258 - 277
  • [5] Better late than never, but never late is better: Risk assessment of nuclear power construction projects
    Portugal-Pereira, J.
    Ferreira, P.
    Cunha, J.
    Szklo, A.
    Schaeffer, R.
    Araujo, M.
    ENERGY POLICY, 2018, 120 : 158 - 166
  • [6] A Critical Review and Benchmark Study of Dependency Modeling for Seismic Probabilistic Risk Assessment in the Nuclear Power Industry
    Zhou, Taotao
    Zhang, Laibin
    Hu, Jinqiu
    Modarres, Mohammad
    Droguett, Enrique Lopez
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2024, 245
  • [7] A Machine Learning-Based Risk Assessment Study of Unsafe Behavior of Workers in Nuclear Power Plants Under Construction
    Shan, Xueqiang
    Yang, Weibo
    Liu, Xia
    Yu, Kai
    Cui, Hui
    PROCESSES, 2025, 13 (02)
  • [8] Small-medium sized nuclear coal and gas power plant: A probabilistic analysis of their financial performances and influence of CO2 cost
    Locatelli, Giorgio
    Mancini, Mauro
    ENERGY POLICY, 2010, 38 (10) : 6360 - 6374