Tracing Study of Tributary Mouth Bar in Yellow-River Xiaolangdi Reservoir during Early Stage of Operation

被引:0
作者
Guo, Xuanying [1 ]
Guo, Shaolei [1 ]
机构
[1] North China Univ Water Resources & Elect Power, Zhengzhou 450011, Peoples R China
来源
CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2 | 2013年 / 438-439卷
关键词
Xiaolangdi Reservoir; tributary mouth bar; tracing research; Yellow-River;
D O I
10.4028/www.scientific.net/AMM.438-439.1299
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
By tracing the performance of China Yellow-River Xiaolangdi Reservoir from operation to 2008, authors found: when the depth of sediment in reservoir tributary ditch mouth is less than 30m or when the length of sediment in reservoir tributary ditch mouth is less than 2km, tributary mouth bar usually will not form. However, when the depth of sediment in reservoir tributary ditch mouth is between 30m and 50m or when the length of sediment in reservoir tributary ditch mouth is less from 2km to 5km, tributary mouth bar tends to form. Moreover, sometimes the mouth bar will show up, disappear and then show up, disappear.
引用
收藏
页码:1299 / 1302
页数:4
相关论文
共 3 条
[1]  
Guo X., 2012, YELLOW RIVER, V4, P1
[2]  
Guo X., 2012, YELLOW RIVER, V9, P21
[3]  
Wan Z., 2012, J NOR CHINA I WATER, V9, P21