A Study on Method of Measuring Performance for Project Management

被引:3
作者
Mochida, Shinji [1 ]
机构
[1] Univ Mkt & Distribut Sci, Fac Commerce, Kobe, Hyogo, Japan
来源
20TH ISPE INTERNATIONAL CONFERENCE ON CONCURRENT ENGINEERING | 2013年
关键词
Project Management; work performance; Gantt chart; critical thinking;
D O I
10.3233/978-1-61499-302-5-264
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Efficient project management is necessary to solve the various problems associated with the completion of a project. Measuring the project's progress and performance accurately is very important for managing projects and for detecting the factors limiting completion of the project. We have investigated the work performance at the beginning of the each on the project. As a result, it has become clear that work performance at the start of the work is not 100% efficient, as can be seen in a performance S-curve. This suggests that the project is initiated. We have constructed a trial system for collecting knowledge and distributing the knowledge to the staff, based on information about faults or undertaken. By providing appropriate knowledge and applying critical thinking, project worker productivity levels will be raised and enhanced. As a result, it will be possible to manage multiple projects, even if workers are taking charge of two or more projects and subsystems at the same time.
引用
收藏
页码:264 / 273
页数:10
相关论文
共 18 条
[11]  
Mochida Shinji, 2012, KNOWLEDGE RETRIEVAL, P255
[12]  
Mochida Shinji, 2007, J BIOMEDICAL FUZZY S, V9, P19
[13]  
Mochida Shinji, 2012, J BIOMEDICAL FUZZY S, V14, P15
[14]  
Parviz F, 2004, PROJECT ESTIMATING C
[15]  
Paul S, 2006, PERFORMANCE BASED EA
[16]  
Rad P. F., 2004, PROJECT ESTIMATING C
[17]  
Royer Paul S., 2009, NOBUO MINEMOTO
[18]  
Zechmeister Eugene B., 2011, CRITICAL THINKING FU