Optimizing the Simplon railway corridor

被引:4
作者
Borndoerfer, Ralf [1 ]
Erol, Berkan [1 ]
Graffagnino, Thomas [2 ]
Schlechte, Thomas [1 ]
Swarat, Elmar [1 ]
机构
[1] Zuse Inst Berlin, D-14195 Berlin, Germany
[2] Schweizer Bundesbahnen SBB AG, Infrastruktur Fahrplan & Netzdesign, CH-300 Bern 65, Switzerland
关键词
Railway track allocation; Network aggregation; Case study; Simplon corridor; COLUMN-GENERATION APPROACH;
D O I
10.1007/s10479-012-1260-9
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a case study of a railway timetable optimization for the very dense Simplon corridor, a major railway connection in the Alps between Switzerland and Italy. The key to deal with the complexity of this scenario is the use of a novel aggregation-disaggregation method. Starting from a detailed microscopic representation as it is used in railway simulation, the data is transformed by an automatic procedure into a less detailed macroscopic representation, that is sufficient for the purpose of capacity planning and amenable to state-of-the-art integer programming optimization methods. This macroscopic railway network is saturated with trains. Finally, the optimized timetable is re-transformed to the microscopic level in such a way that it can be operated without any conflicts among the train paths. Using this micro-macro aggregation-disaggregation approach in combination with integer programming methods, it becomes for the first time possible to generate a profit maximal and conflict free timetable for the complete Simplon corridor over an entire day by a simultaneous optimization of all trains requests. In addition, this also allows us to undertake a sensitivity analysis of various problem parameters.
引用
收藏
页码:93 / 106
页数:14
相关论文
共 26 条
[11]   Modeling and solving the train timetabling problem [J].
Caprara, A ;
Fischetti, M ;
Toth, P .
OPERATIONS RESEARCH, 2002, 50 (05) :851-861
[12]  
Caprara A., 2007, DAGST SEM P ATMOS SC, V07001
[13]   Centralized versus distributed systems to reschedule trains in two dispatching areas [J].
Corman F. ;
D'Ariano A. ;
Pacciarelli D. ;
Pranzo M. .
Public Transport, 2010, 2 (03) :219-247
[14]  
EROL B, 2008, COMPUTERS RAILWAYS, V11
[15]  
FISCHER F, 2008, ATMOS 2008
[16]  
Groger T., 2002, THESIS I RHERINISCH
[17]  
Hansen IngoArne., 2008, RAILWAY TIMETABLE TRAFFIC, Analysis, Modeling, Simulation, V1
[18]  
HURLIMANN D, 2001, THESIS ETH ZURICH
[19]  
Jespersen-Groth J, 2009, LECT NOTES COMPUT SC, V5868, P399, DOI 10.1007/978-3-642-05465-5_18
[20]  
Kettner M., 2003, P EUR TRANSP C WASH