Cash flow system development framework within integrated project delivery (IPD) using BIM tools

被引:45
作者
Elghaish, Faris [1 ]
Abrishami, Sepehr [1 ]
Abu Samra, Soliman [2 ]
Gaterell, Mark [1 ]
Hosseini, M. Reza [3 ]
Wise, Richard [1 ]
机构
[1] Portsmouth Univ, Sch Civil Engn & Surveying, Portsmouth, Hants, England
[2] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ, Canada
[3] Deakin Univ, Sch Architecture & Bldg, Geelong Waterfront Campus, Geelong, Vic, Australia
关键词
Cash flow; cash inflow; outflow; BIM; integrated project delivery (IPD); 4D and 5D BIM; activity based costing (ABC); BUILDING INFORMATION; COST; MANAGEMENT; SCHEDULE; PROGRESS; MODEL;
D O I
10.1080/15623599.2019.1573477
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Integrated Project Delivery (IPD) endeavour to revamp AEC project outcomes through a collaborative method of regulating project stakeholders' goals through creation of a platform that provide early participants involvement and shared risk and rewards. IPD does not include a tender stage to select the optimal bid, therefore, this article presents a methodology framework to develop a cash flow approach using BIM tools. This article adopts Activity Based Costing (ABC), due to its ability to allocate different costs precisely to each construction process. Given that the BIM and IPD target is to achieve the best collaboration among project parties, the proposed framework backing this by displaying all estimated cost data of each package as minimum/maximum estimated cash inflow, during the buyout stage, for informed decision making. This article extends the knowledge relating to IPD implementing process, as well as, improving cost management process based on BIM. Extant literature review highlights the gap of utilising BIM tools to develop cash flow curves, as well as the IPD cost structure requirements. To demonstrate the applicability and validity of the proposed model, it is applied to a real-life case study, which displays promising results in terms of developing IPD's cash flow management approach.
引用
收藏
页码:555 / 570
页数:16
相关论文
共 52 条
[1]   A stochastic model of cash flow forecasting considering delays in owners' payments [J].
Andalib, Reza ;
Hoseini, Abdollah ;
Gatmiri, Behrouz .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (10) :545-564
[2]  
[Anonymous], INT PROJ DEL GUID VE
[3]  
Ashcraft H., 2009, THE IPD FRAMEWORK
[4]  
Ashcraft H.W., 2008, CONSTRUCTION LAWYER, V28, P1
[5]   Improving project forecast accuracy by integrating earned value management with exponential smoothing and reference class forecasting [J].
Batselier, Jordy ;
Vanhoucke, Mario .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2017, 35 (01) :28-43
[6]  
Bedrick J., 2006, REPORT INTEGRATED PR
[7]   WRITING A REVIEW ARTICLE FOR PSYCHOLOGICAL-BULLETIN [J].
BEM, DJ .
PSYCHOLOGICAL BULLETIN, 1995, 118 (02) :172-177
[8]  
Bryman A., 2015, Social research methods
[9]  
Bum Kim Hak, 2013, [Korean Association of Addiction Crime Review, 한국중독범죄학회보], V3, P1
[10]   Revenue guarantee in public-private partnerships: a win-win model [J].
Carbonara, Nunzia ;
Pellegrino, Roberta .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2018, 36 (10) :584-598