Design overview of the ITER core CXRS fast shutter and manufacturing implications during the detailed design work

被引:5
作者
Bardawil, David Antonio Castano [1 ]
Mertens, Philippe [1 ]
Offermanns, Guido [2 ]
Behr, Wilfried [2 ]
Hawkes, Nick [3 ]
Krasikov, Yury [1 ]
Balboa, Itziar [3 ]
Biel, Wolfgang [1 ]
Samm, Ulrich [1 ]
机构
[1] Forschungszentrum Julich GmbH, Inst Energy & Climate Res Plasma Phys, Aachen, Germany
[2] Forschungszentrum Julich GmbH, Cent Inst Engn Elect & Analyt, Julich, Germany
[3] Culham Ctr Fus Energy, Munich, Germany
关键词
Shutter; Actuator; CXRS; Port plug; First mirror; Prototype; Optics; Diagnostics;
D O I
10.1016/j.fusengdes.2015.06.008
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
At first a detailed fast shutter design was finalized for the ITER core charge exchange recombination spectroscopy (CXRS) diagnostic. The shutter has approximately 70 kg of mass and a length of 2.1 m. It operates in fractions of a second (0.7 s) protecting critical optical components against degradation and providing means of calibration for the optical system. The shutter structure is driven by a bidirectional frictionless helium actuator, with forces and axial strokes of 3.4 kN and 2 mm respectively. The shutter structure consists of: (a) two blades made of CuCrZr and stainless steel, calibration surfaces (currently Al2O3) on the top and on the bottom a protective TZM (Mo-0.5Ti-0.08Zr) screens, (b) two arms interconnected that form one cooling circuit including the blades, (c) a bumper system to limit the arms movement, and (d) a support. A description of these components and their functions are given in this paper, followed by some issues, and their corresponding solutions or ongoing investigations, encountered during the design work. Detailed manufacturing drawings have been developed as the deliverable final product of this design stage, and are used in the prototyping phase which includes testing, numerical benchmarking, and validation of the shutter concept. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:746 / 750
页数:5
相关论文
共 10 条
[1]   Fast shutter concepts for the new ITER core CXRS upper port plug baseline considering the actuator located inside and outside the port plug [J].
Bardawil, David Antonio Castano ;
Krasikov, Yury ;
Panin, Anatoly ;
Neubauer, Olaf ;
Biel, Wolfgang .
FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) :2073-2076
[2]  
Bief W., 2011, FUSION ENG DES, V86, P548
[3]  
Bralla J.G., 1998, DESIGN MANUFACTURABI, P1368
[4]   Development of design options for the port plug components of the ITER core CXRS diagnostic [J].
Krasikov, Yu. ;
Baross, T. ;
Biel, W. ;
Litnovsky, A. ;
Hawkes, N. ;
Kiss, G. ;
Klinkhamer, J. F. F. ;
Koning, J. F. ;
Krimmer, A. ;
Neubauer, O. ;
Panin, A. .
FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) :2055-2059
[5]  
Krimmer A., 2011, FUSION ENG DES, P1306
[6]   Dynamic structural analysis of a fast shutter with a pneumatic actuator [J].
Nemov, A. ;
Panin, A. ;
Borovkov, A. ;
Khovayko, M. ;
Zhuravskaya, E. ;
Krasikov, Yu ;
Biel, W. ;
Neubauer, O. .
FUSION ENGINEERING AND DESIGN, 2013, 88 (9-10) :2133-2137
[7]   Structural Analysis of a Prototype Fast Shutter for ITER cCXRS Diagnostic [J].
Panin, A. ;
Biel, W. ;
Krasikov, Y. ;
Neubauer, O. ;
Bardawil, D. A. Castano .
IEEE TRANSACTIONS ON PLASMA SCIENCE, 2012, 40 (03) :746-752
[8]  
Patel K., 2012, COMMUNICATION
[9]  
Pitcher S., 2011, COMMUNICATION
[10]   Conceptual design of the ITER upper port plug for charge exchange diagnostic [J].
Sadakov, S. ;
Baross, T. ;
Biel, W. ;
Borsuk, V. ;
Hawkes, N. ;
von Hellermann, M. ;
Gille, P. ;
Kiss, G. ;
Koning, J. ;
Knaup, M. ;
Klinkhamer, F. ;
Krasikov, Yu. ;
Litnovsky, A. ;
Neubauer, O. ;
Panin, A. .
FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) :1671-1675