共 50 条
- [31] Economic Risk Assessment of Expressway Project Based on Elementary Catastrophe Theory PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 75 - 78
- [32] Comparative Analysis on BOT, PPP and ABS Project Financing Models PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1077 - 1082
- [33] The risk assessment of overseas infrastructure project by PPP/BOT mode Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1089 - 1091
- [34] Brief discussion in Chinese BOT project and related guarantee and insurance ORIENT ACADEMIC FORUM SPECIAL, 2004, : 535 - 542
- [35] Risk evaluation index system and methods of BOT project finance PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
- [36] Evaluation of Expressway Alignment Coordination Based on Operating Speed: A Case Study of Suiyan Expressway CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 4785 - 4796
- [37] Deformation mechanism for the pavement and embankment of Jinsha Flyover of Yihuang expressway PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON WATER RESOURCES AND THE URBAN ENVIRONMENT, 2003, : 574 - 578
- [38] Determination of the key parameters in wastewater treatment BOT contract Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 138 - 142
- [39] Multi-Criteria Decision Model for BOT Project Selection: The Case Study of Sewerage System Plan in Taiwan PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 245 - 249