Study on the Mechanism of Expressway BOT Project Rate Determination

被引:0
|
作者
Mu, Yi [1 ]
机构
[1] Southwest Jiao Tong Univ, Publ Adm, Chengdu 610031, Peoples R China
来源
2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013) | 2013年 / 26卷
关键词
BOT; Expressway; Rate to determine the mechanism; ROAD NETWORK;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the privatization of infrastructure investment, private capital investment in infrastructure projects has become an effective way to alleviate the financial burden on the government, BOT (Build-Operate-Transfer) is one of the investment modes. The emergence of BOT mode, has made a significant contribution to the infrastructure construction, but many problems also appeared in the process of operation. How to determine the rate of BOT project is one of the problems, it is also one of the most controversial and the most pressing question. How to determine the rate mechanism, this article made a detailed research from the government, the item company and the road users of the three parties.
引用
收藏
页码:718 / 722
页数:5
相关论文
共 50 条
  • [31] Economic Risk Assessment of Expressway Project Based on Elementary Catastrophe Theory
    Lee, Jian
    Yuanhua, Jia
    Changao, Gu
    Chuanrong, Cao
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 75 - 78
  • [32] Comparative Analysis on BOT, PPP and ABS Project Financing Models
    Huang, Wenqian
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1077 - 1082
  • [33] The risk assessment of overseas infrastructure project by PPP/BOT mode
    Ren, LA
    Tao, P
    Proceedings of 2005 International Conference on Construction & Real Estate Management, Vols 1 and 2: CHALLENGE OF INNOVATION IN CONSTRUCTION AND REAL ESTATE, 2005, : 1089 - 1091
  • [34] Brief discussion in Chinese BOT project and related guarantee and insurance
    Zhang, Y
    Ma, JM
    Shen, JY
    ORIENT ACADEMIC FORUM SPECIAL, 2004, : 535 - 542
  • [35] Risk evaluation index system and methods of BOT project finance
    Huang, XY
    Xiong, F
    Gao, XJ
    PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS 1 AND 2, 2004, : 2483 - 2488
  • [36] Evaluation of Expressway Alignment Coordination Based on Operating Speed: A Case Study of Suiyan Expressway
    Liu, Shan-Shan
    Wang, Jian-Jun
    Long, Xue-Qin
    Zhang, Lian-Cai
    CICTP 2020: TRANSPORTATION EVOLUTION IMPACTING FUTURE MOBILITY, 2020, : 4785 - 4796
  • [37] Deformation mechanism for the pavement and embankment of Jinsha Flyover of Yihuang expressway
    Tang, ZH
    Wang, Y
    Zhang, BQ
    PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON WATER RESOURCES AND THE URBAN ENVIRONMENT, 2003, : 574 - 578
  • [38] Determination of the key parameters in wastewater treatment BOT contract
    Gong Daihua
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 138 - 142
  • [39] Multi-Criteria Decision Model for BOT Project Selection: The Case Study of Sewerage System Plan in Taiwan
    Yan, Min-Ren
    Chang, Bang-Lee
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 245 - 249
  • [40] THE ANALYSIS OF BOT STRATEGIES BASED ON GAME THEORY - CASE STUDY ON TAIWAN'S HIGH SPEED RAILWAY PROJECT
    Chen, Tien-Chien
    Lin, Yu-Cheng
    Wang, Lung-Chuang
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012, 18 (05) : 662 - 674