Study on the Mechanism of Expressway BOT Project Rate Determination

被引:0
|
作者
Mu, Yi [1 ]
机构
[1] Southwest Jiao Tong Univ, Publ Adm, Chengdu 610031, Peoples R China
来源
2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013) | 2013年 / 26卷
关键词
BOT; Expressway; Rate to determine the mechanism; ROAD NETWORK;
D O I
暂无
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
With the privatization of infrastructure investment, private capital investment in infrastructure projects has become an effective way to alleviate the financial burden on the government, BOT (Build-Operate-Transfer) is one of the investment modes. The emergence of BOT mode, has made a significant contribution to the infrastructure construction, but many problems also appeared in the process of operation. How to determine the rate of BOT project is one of the problems, it is also one of the most controversial and the most pressing question. How to determine the rate mechanism, this article made a detailed research from the government, the item company and the road users of the three parties.
引用
收藏
页码:718 / 722
页数:5
相关论文
共 50 条
  • [21] APPLICATION OF SETTLEMENT RATE METHOD IN HANGPU EXPRESSWAY
    Gu, C. C.
    Gong, L. M.
    Mei, J. S.
    Hou, L. X.
    GROUND IMPROVEMENT TECHNOLOGIES AND CASE HISTORIES, 2010, : 403 - 409
  • [22] The effects of service level on BOT transport project contract
    Zhang, Yiwen
    Feng, Zhuo
    Zhang, Shuibo
    Song, Jinbo
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2018, 118 : 184 - 206
  • [23] Status and Psychology of DBB and BOT Construction Project Participants
    Leu, Wen-Hao
    Chang, Andrew S.
    FRONTIERS OF GREEN BUILDING, MATERIALS AND CIVIL ENGINEERING, PTS 1-8, 2011, 71-78 : 160 - 166
  • [24] Traffic and revenue forecast at risk for a BOT road project
    Swapan Kumar Bagui
    Ambarish Ghosh
    KSCE Journal of Civil Engineering, 2012, 16 : 905 - 912
  • [25] Support Loan Concept for the Viability of a BOT Road Project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2013, 7 (01) : 17 - 25
  • [26] Traffic and revenue forecast at risk for a BOT road project
    Bagui, Swapan Kumar
    Ghosh, Ambarish
    KSCE JOURNAL OF CIVIL ENGINEERING, 2012, 16 (06) : 905 - 912
  • [27] Settlement monitoring and analysis for soft foundation of an expressway widening project
    Liu Guan-shi
    Kong Ling-wei
    Ding Feng
    Gu Jian-wu
    ROCK AND SOIL MECHANICS, 2007, 28 (02) : 331 - 335
  • [28] Study on Incentive Mechanism of BOT Financing Model for Low-Renting Public Housing
    Liu, Fangqiang
    Dai, Jiansheng
    Wang, Liming
    ADVANCES IN APPLIED ECONOMICS, BUSINESS AND DEVELOPMENT, PT II, 2011, 209 : 91 - +
  • [29] A CASE STUDY ON ACCOUNTING OF BOT CONCESSION PROJECT: TAKING A LARGE SEWAGE TREATMENT PLANT IN A CITY AS AN EXAMPLE
    Chen, Shaolan
    Zheng, Wenhui
    FRESENIUS ENVIRONMENTAL BULLETIN, 2020, 29 (10): : 9352 - 9356
  • [30] Application Research of BOT in Water Conservancy Project-Case Study in Huzhou Tiger Lake Reservoir
    Hu Qi-chang
    Yan Yan
    Jiang Han-zhao
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON PUBLIC ADMINISTRATION (5TH), VOL I, 2009, : 825 - 832