共 8 条
[1]
[Anonymous], 2005, STAND CONSTR WORKS C
[2]
Predicting cost deviation in reconstruction projects: Artificial neural network versus regression
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
2003, 129 (04)
:405-411
[3]
El-Sawy I., 2011, arXiv:1106.1570), V8, P273, DOI DOI 10.48550/ARXIV.1106.1570
[4]
Neural network model for parametric cost estimation of highway projects
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (03)
:210-218
[5]
Lesniak A., 2002, SCI PAPERS SILESIAN, V95, P331
[7]
Williams T.P., 2002, Constr. Manage. Economics, V20, P225, DOI DOI 10.1080/01446190110112838