The power generation expansion planning in Brazil: Considering the impact of greenhouse gas emissions in an Investment Decision Model

被引:13
|
作者
Paes, Carlos Eduardo [1 ]
Gandelman, Dan Abensur [2 ]
Firmo, Heloisa Teixeira [3 ]
Bahiense, Laura [1 ,4 ]
机构
[1] Univ Fed Rio de Janeiro UFRJ, Alberto Luiz Coimbra Inst, Syst Engn & Comp Sci Program, Grad Sch & Res Engn, Rio De Janeiro, Brazil
[2] Univ Fed Fluminense UFF, Environm & Agr Engn Dept, Rio De Janeiro, Brazil
[3] Univ Fed Rio de Janeiro UFRJ, Water Resources & Environm Dept, Rio De Janeiro, Brazil
[4] Univ Fed Rio de Janeiro UFRJ, Alberto Luiz Coimbra Inst, Transportat Engn Program, Grad Sch & Res Engn, Rio De Janeiro, Brazil
关键词
Power generation expansion planning; Renewable energy; Greenhouse gases emission; Mathematical programming decision model; ELECTRICITY; SCHEMES; PRICES; POLICY;
D O I
10.1016/j.renene.2021.11.060
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The Generation Expansion Planning (GEP) process in Brazil involves computational models with a range of variables and constraints inherent in a mostly hydrothermal system. Such models generally use technical and economic parameters to represent the system, but with the growing concern about environmental and climatic issues, the need has arisen for environmental parameter analysis to promote a better representation of a more comprehensive optimum. In view of the recent Paris Agreement, through which the Brazilian government committed itself to significantly reduce its greenhouse gas emissions (GHG) by 2030, it has become essential that the GEP take into account the emission of gases. In this work, scenarios that penalize or limit the emission of greenhouse gases are created and compared inside the existent Investment Decision Model (MDI) used in Brazil. The main objective is to verify how the objective of reducing emissions would change the optimum expansion planning originally provided by the investment model. The results show that within the created scenarios, the largest reduction is achieved when considering a monetary penalty of US$ 25.00/tCO(2eq) in the burning of fossil fuels for power generation. In this case, to reduce the emissions, the investment model chooses a larger expansion of wind and biomass sources with a corresponding raise in the cost of approximately 5.3%, allowing a total reduction of about 39 MtCO(2eq) in relation to the reference scenario at the end of the planning horizon. (C) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页码:225 / 238
页数:14
相关论文
共 50 条
  • [1] The power generation expansion planning in Brazil: Considering the impact of greenhouse gas emissions in an Investment Decision Model
    Paes, Carlos Eduardo
    Gandelman, Dan Abensur
    Firmo, Heloisa Teixeira
    Bahiense, Laura
    Renewable Energy, 2022, 184 : 225 - 238
  • [2] Rolling Decision Model of Thermal Power Retrofit and Generation Expansion Planning Considering Carbon Emissions and Power Balance Risk
    Pan D.
    Gui X.
    Xu J.
    Shen Y.
    Xu H.
    Ma Y.
    Energy Engineering: Journal of the Association of Energy Engineering, 2024, 121 (05): : 1309 - 1328
  • [3] Generation Investment Expansion Planning for Wind Power Accommodation Considering Investment Risk
    Lou S.
    Lü M.
    Wang Y.
    Wu Y.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (07): : 1944 - 1955
  • [4] Stochastic Generation Capacity Expansion Planning Reducing Greenhouse Gas Emissions
    Park, Heejung
    Baldick, Ross
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (02) : 1026 - 1034
  • [5] ENERGY GENERATION EXPANSION PLANNING MODEL CONSIDERING EMISSIONS CONSTRAINTS
    Mejia Giraldo, Diego Adolfo
    Lopez Lezaivia, Jesus Maria
    Gallego Pareja, Luis Alfonso
    DYNA-COLOMBIA, 2010, 77 (163): : 75 - 84
  • [6] Evaluation of greenhouse gas emissions associated with electric power generation in Brazil
    Carvalho, FD
    Bizzo, W
    GREENHOUSE GAS CONTROL TECHNOLOGIES, 2001, : 929 - 934
  • [7] Linking greenhouse gas emissions footprint and energy return on investment in electricity generation planning
    Walmsley, Michael R. W.
    Walmsley, Timothy G.
    Atkins, Martin J.
    JOURNAL OF CLEANER PRODUCTION, 2018, 200 : 911 - 921
  • [8] Natural gas prices, electric generation investment, and greenhouse gas emissions
    Brehm, Paul
    RESOURCE AND ENERGY ECONOMICS, 2019, 58
  • [9] Computational Model of Greenhouse Gas Emissions of Power Station Boiler Considering Desulphurization
    Wang, Hu
    Li, Shaohua
    Lai, Fusheng
    Wang, Bin
    INTERNATIONAL CONFERENCE ON APPLIED PHYSICS AND INDUSTRIAL ENGINEERING 2012, PT A, 2012, 24 : 44 - 49
  • [10] Power system capacity expansion planning model considering carbon emissions constraints
    Mejia Giraldo, Diego Adolfo
    Lopez Lezama, Jesus Maria
    Gallego Pareja, Luis Alfonso
    REVISTA FACULTAD DE INGENIERIA-UNIVERSIDAD DE ANTIOQUIA, 2012, (62): : 114 - 125