共 50 条
- [36] Techno-economic evaluation of an elevated temperature pressure swing adsorption process in a 540 MW IGCC power plant with CO2 capture 12TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-12, 2014, 63 : 2016 - 2022
- [38] Chemical Looping for Pre-combustion CO2 Capture - Performance and Cost Analysis GHGT-11, 2013, 37 : 618 - 625
- [40] Developments in the pre-combustion CO2 capture pilot plant at the Buggenum IGCC 10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1214 - 1221