An integrated model for evaluation and optimisation of business project portfolios

被引:5
作者
Cannarozzo Tinoco, Maria Auxiliadora [1 ]
Dutra, Camila Costa [1 ]
Duarte Ribeiro, Jose Luis [1 ]
Miorando, Rogerio Feroldi [2 ]
ten Caten, Carla Schwengber [1 ]
机构
[1] Univ Fed Rio Grande do Sul, Dept Ind & Transportat Engn, Porto Alegre, RS, Brazil
[2] Univ Fed Santa Catarina, Dept Engn & Prod Syst, Florianopolis, SC, Brazil
关键词
project portfolio selection; economic analysis; social and environmental impact analysis; probabilistic optimisation; ECONOMIC-PROBABILISTIC MODEL; SUSTAINABLE PROJECT; MANAGEMENT; METHODOLOGY; INDICATORS; SELECTION;
D O I
10.1504/EJIE.2018.092010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents an integrated model for the evaluation and probabilistic optimisation of project portfolios, integrating economic, social and environmental impacts analysis. The contribution of the proposed model lies in: 1) an extended list of criteria covering economic, social and environmental aspects; 2) use of financial measures, which are easily understood; 3) use of Monte Carlo simulation to cope with variability; 4) use of mathematical optimisation to deal with constraints and/or large amount of information. A practical test carried out in a company is reported and confirms the applicability and usefulness of the model. The integration of approaches for sustainable assessment of business projects and selection and optimisation of project portfolio is deficient in literature. Thereby, the proposed model is presented as an alternative to conduct integrated analysis and define optimal project portfolio for sustainable development in business contexts characterised by uncertainties.
引用
收藏
页码:442 / 463
页数:22
相关论文
共 36 条
[1]  
Amaral A., 2009, WORLD ACAD SCI ENG T, V3, P1919
[2]  
[Anonymous], 2000, Simulation modeling and analysis
[3]  
Archer N., 2007, Project Portfolio Selection and Management, P94
[4]  
Baloi D., 2003, International Journal of Project Management, V21, P261, DOI 10.1016/S0263-7863(02)00017-0
[5]   An integrated real options evaluating model for information technology projects under multiple risks [J].
Chen, Tao ;
Zhang, Jinlong ;
Lai, Kin-Keung .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (08) :776-786
[6]   Portfolio management for new product development: results of an industry practices study [J].
Cooper, R ;
Edgett, S ;
Kleinschmidt, E .
R & D MANAGEMENT, 2001, 31 (04) :361-380
[7]   Integrated project evaluation and selection using multiple-attribute decision-making technique [J].
Dey, Prasanta Kumar .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 103 (01) :90-103
[8]   An economic-probabilistic model for project selection and prioritization [J].
Dutra, Camila Costa ;
Ribeiro, Jose Luis Duarte ;
de Carvalho, Many Monteiro .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (06) :1042-1055
[9]   R&D project evaluation: An integrated DEA and balanced scorecard approach [J].
Eilat, Harel ;
Golany, Boaz ;
Shtub, Avraham .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (05) :895-912
[10]   Multi-objective binary cuckoo search for constrained project portfolio selection under uncertainty [J].
El-Kholany, Mohammed M. S. ;
Abdelsalam, Hisham M. .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2017, 11 (06) :818-853