Modeling of design iterations through simulation

被引:16
作者
Wang, Wei-Chih [1 ]
Liu, Jang-Jeng [1 ]
Liao, Tzong-Shiun [1 ]
机构
[1] Natl Chiao Tung Univ, Dept Civil Engn, Hsinchu 300, Taiwan
关键词
design iteration; design schedule; design process; dependency structure matrix; simulation;
D O I
10.1016/j.autcon.2005.07.010
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Enhancing the scheduling of a design project can markedly reduce its total duration. However, accurately representing the schedule of a design project is complex, largely owing to that design activities generally depend on information about each other. That is, the design process involves many iterations across activities. Iterative dependency makes difficult defining the logical relationships among activities in the network and evaluating the duration of the project. This work applies a dependency structure matrix to identify design dependencies. Causes and various types of design iterations for a building project are presented. Additionally, an innovative simulation-based model is developed to incorporate the design iterations, deliverables and participants for generating a schedule of a design project. The proposed model can not only assess how design iterations affect the duration, but also evaluate the idle durations of the design participants to support the assignment of design tasks. Effectiveness of the model is demonstrated through its application to an example project. (c) 2005 Elsevier B.V. All rights reserved.
引用
收藏
页码:589 / 603
页数:15
相关论文
共 29 条
[1]  
[Anonymous], AUTOMATION CONSTRUCT
[2]  
Austin S., 1999, DESIGN STUDIES, V20, P279, DOI [10.1016/S0142-694X(98)00038-6, DOI 10.1016/S0142-694X(98)00038-6]
[3]  
Austin S., 1994, Construction Management and Economics, V12, P445
[4]  
Austin S., 2000, Construction Management and Economics, V18, P173, DOI DOI 10.1080/014461900370807
[5]  
Baldwin A. N., 1998, Automation in Construction, V8, P149, DOI 10.1016/S0926-5805(98)00059-4
[6]  
BALDWIN AN, 1999, CONSTRUCTION MANAGEM, V17, P155, DOI DOI 10.1080/014461999371655
[7]   Reasons for cost and schedule increase for engineering design projects [J].
Chang, AST .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2002, 18 (01) :29-36
[8]  
Chang JJ, 2002, J GEN INTERN MED, V17, P122
[9]   DePlan: a tool for integrated design management [J].
Choo, HJ ;
Hammond, J ;
Tommelein, ID ;
Austin, SA ;
Ballard, G .
AUTOMATION IN CONSTRUCTION, 2004, 13 (03) :313-326
[10]   Process-parameter-interface model for design management [J].
Chua, DKH ;
Tyagi, A ;
Ling, S ;
Bok, SH .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (06) :653-663