Challenges in calibration of water distribution network: a case study of Ramnagar Elevated Service Reservoir command area in Nagpur City, India

被引:4
作者
Rathi, Shweta [1 ]
Gupta, Rajesh [1 ]
Labhasetwar, Pawan [2 ]
Nagarnaik, Pranav [2 ]
机构
[1] Visvesvaraya Natl Inst Technol, Civil Engn Dept, Nagpur 440010, Maharashtra, India
[2] Natl Environm Engn Res Inst, Nagpur 440020, Maharashtra, India
关键词
calibration; hydraulic model; network simulation; water distribution network; PARAMETER-ESTIMATION; DEMAND PATTERN; MODELS; SYSTEM;
D O I
10.2166/ws.2020.047
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Calibration of a hydraulic model is a challenging task as it considers the involvement of a large number of uncertain parameters. There are some parameters like length and diameter of pipes, for which fairly accurate values can be obtained. As with all hydraulic models, water demands are one of the main parameters that cause the most uncertainty in the model outputs. The calibration of the water demands is usually not feasible, which is attributable to the limited quantity of available measurements in most real water networks. However, some parameters like nodal demands and pipe roughness coefficients are estimated close to the actual values. Various types of valves are used for flow control by throttling. Hence, their setting in the field is also an important input to the model. Having more precise data helps in reducing time and results in better calibration as presented in the case study of one hydraulic zone served from Ramnagar Elevated Service Reservoir (ESR) (Zone II) in Nagpur City, Maharashtra State, India. This paper aims at presenting the complexities and challenges involved in calibration of the study area. It further describes the entire process from collection of the required data to the calibration of the network.
引用
收藏
页码:1294 / 1312
页数:19
相关论文
共 37 条
  • [1] [Anonymous], 1999, MODELLING OPTIMISATI
  • [2] Simultaneous zonation and calibration of pipe network parameters
    Bascià, A
    Tucciarelli, T
    [J]. JOURNAL OF HYDRAULIC ENGINEERING, 2003, 129 (05) : 394 - 403
  • [3] Bhave P.R., 2006, Analysis of Water Distribution Networks
  • [4] CALIBRATING WATER DISTRIBUTION NETWORK MODELS
    BHAVE, PR
    [J]. JOURNAL OF ENVIRONMENTAL ENGINEERING-ASCE, 1988, 114 (01): : 120 - 136
  • [5] EXPLICIT CALCULATION OF PIPE-NETWORK PARAMETERS
    BOULOS, PF
    WOOD, DJ
    [J]. JOURNAL OF HYDRAULIC ENGINEERING-ASCE, 1990, 116 (11): : 1329 - 1344
  • [6] CESARIO AL, 1984, J AM WATER WORKS ASS, V76, P66
  • [7] PARAMETER-ESTIMATION IN WATER-DISTRIBUTION SYSTEMS BY LEAST-SQUARES
    DATTA, RSN
    SRIDHARAN, K
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1994, 120 (04): : 405 - 422
  • [8] A genetic algorithm for demand pattern and leakage estimation in a water distribution network
    Di Nardo, Armando
    Di Natale, Michele
    Gisonni, Corrado
    Iervolino, Michele
    [J]. JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2015, 64 (01): : 35 - 46
  • [9] A New Method for Simultaneous Calibration of Demand Pattern and Hazen-Williams Coefficients in Water Distribution Systems
    Dini, Mehdi
    Tabesh, Massoud
    [J]. WATER RESOURCES MANAGEMENT, 2014, 28 (07) : 2021 - 2034
  • [10] Calibration of Water Demand Multipliers in Water Distribution Systems Using Genetic Algorithms
    Do, Nhu C.
    Simpson, Angus R.
    Deuerlein, Jochen W.
    Piller, Olivier
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2016, 142 (11)