Optimal ordering policies with convertible lead times

被引:11
作者
Gallego, Guillermo
Jin, Yue
Muriel, Ana
Zhang, Ge
Yildiz, V. Taylan
机构
[1] Univ Massachusetts, Dept Mech & Ind Engn, Amherst, MA 01003 USA
[2] Columbia Univ, Dept Ind Engn & Operat Res, New York, NY 10027 USA
[3] Univ Salamanca, Fac Econ & Empres, E-37008 Salamanca, Spain
基金
美国国家科学基金会;
关键词
inventory; dynamic programming; expediting; emergency orders; dual supply modes;
D O I
10.1016/j.ejor.2005.08.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A firm receives orders that will be required at an uncertain time given by an Erlang distribution, and over time observes the associated independent exponential events. The firm, in turn, places orders at a linear cost from a supplier with fixed lead time I and has the option of converting (expediting) each order, at a cost, over a certain time interval after the order is originally placed. A converted order arrives l(e) < l units of time after it is converted. We show that a threshold policy is optimal. Under such a policy the firm places an order after a certain number of exponential events have been observed. An order is converted the first time, if any, when the residual lead time exceeds a time threshold related to the number of exponential events realized since the order was placed. (c) 2005 Published by Elsevier B.V.
引用
收藏
页码:892 / 910
页数:19
相关论文
共 18 条
[1]  
Arslan H, 2001, IIE TRANS, V33, P1019, DOI 10.1080/07408170108936892
[2]  
Barankin EW., 1961, NAVAL RES LOGIST Q, V8, P285, DOI DOI 10.1002/NAV.3800080310
[3]   A Brownian approximation of a production-inventory system with a manufacturer that subcontracts [J].
Bradley, JR .
OPERATIONS RESEARCH, 2004, 52 (05) :765-784
[4]  
Bulinskaya E., 1964, THEORY PROB APPLI, V9, P502
[5]  
DANIEEL KH, 1963, MULTISTAGE INVENTORY, P85
[6]   OPTIMAL POLICIES FOR THE INVENTORY PROBLEM WITH NEGOTIABLE LEADTIME [J].
FUKUDA, Y .
MANAGEMENT SCIENCE, 1964, 10 (04) :690-708
[7]  
Gallego G., 2004, Myopic Policies in Continuous Inventory Systems with Emergency Orders
[8]  
Gallego G., 2000, When to Share Demand Information in a Simple Supply Chain
[9]  
KATIRCIOGLU K, 1996, THESIS U BRIT COLUMB, P70
[10]   EOQ MODEL UNDER STOCHASTIC LEAD TIME [J].
LIBERATORE, MJ .
OPERATIONS RESEARCH, 1979, 27 (02) :391-396